Drilling of first exploratory well by TPOC- OVL consortium in NC-188 exploration block has commenced on 2nd November 2003. A high capacity rig GW-118 is deployed for this purpose in the challenging terrain of the Sahara deserts. Spudding of the well is considered to be an important milestone after successful completion of seismic campaign of 2D and 3D data acquisition. Pre-drill
3D seismic studies carried out jointly by TPOC – OVL team has enhanced the understanding of existing plays in the block and identifying the drilling location.
OVL holds 49% stake in two exploration Blocks; NC188 and NC 189 where the remaining 51% is held by TPOC , which is also the operator.