Gulf Oil and Gas accountACCOUNT

Development Plan Being Specified at Block 245 South

Source: www.gulfoilandgas.com 4/4/2012, Location: Africa

Rosneft-Stroytransgaz Limited (RN-STG), controlled by Rosneft and Stroytransgaz, is working jointly with Sonatrach, Algeria’s national oil company, to begin reservoir delineation at three earlier discovered deposits within Block 245 South in Algeria. The three deposits are East Takuazet, West Takuazet and North Tisselit.

The aim of reservoir delineation is to specify the development programme for these deposits. It involves 3D seismic survey (covering an area of 386 square kilometres), the drilling of three new wells, two horizontal sidetracks and a horizontal offshoot.

To date, all of the planned seismic survey work has been completed, sites have been prepared for drilling and drilling of the first well has begun. Work is scheduled for completion in September 2012.

Seismic survey News in Algeria >>

Norway >>  5/16/2019 - Electromagnetic Geoservices (EMGS) has entered into an agreement for a fully pre-funded multi-client 3D CSEM survey in the Norwegian Barents Sea. The ...
Australia >>  5/15/2019 - 3D Oil Limited (3D Oil) is pleased to inform the market that it has been awarded the necessary environmental approvals from the Commonwealth Statuary ...

China >>  5/15/2019 - Empyrean Energy, the oil and gas development company with interests in China, Indonesia and the United States, has advised that comprehensive analysis...
Guinea >>  5/15/2019 - PGS’ latest MultiClient 3D GeoStreamer acquisition covering blocks A4 and A5 of the Republic of Guinea was completed on 8th May 2019. Fast-track proce...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Algeria Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 |

Oil & Gas Projects in Algeria >>

More News

Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.