Gulf Oil and Gas accountACCOUNT

On-Time Start-Up of the S70 Project for Saudi Aramco

Source: www.gulfoilandgas.com 6/11/2012, Location: Middle East

In fulfilling the contract commitment, BGP crew commenced the 3D seismic survey of S70 project for Saudi Aramco on June 1. The project adopts a new technique---Distance Separated Simultaneous Sweeping (DSSS) acquisition--along with the deployment of 30 vibrators and 60,000 channels.

As the project is located in the middle of the largest oil production field in the world--Ghawar, a densely populated area encompassing a myriad of oil field facilities, industrial districts, towns and farms; hence challenges aplenty are confronting BGP crew in land permit application, HSE management and operations, etc.

Additionally, BGP management and crew have been able to overcome a series of obstacles during the preparation for start-up in mobilizing a large number of equipment within a very short time frame, application of new technique and equipment as well as meeting the requirement of employing a high percentage of local workers.

Seismic survey News in Saudi Arabia >>

Ireland >>  2/18/2019 - Providence Resources P.l.c., the Irish based Oil and Gas Exploration Company, provides an update on Frontier Exploration Licence (“FEL”) 2/19, operate...
United States >>  2/12/2019 - TGS announces a new multi-client onshore 3D seismic survey, Railgun 3D, located within the Powder River Basin. ...

Norway >>  2/11/2019 - CGG and TGS announce the Greater Castberg TopSeis™ survey in the Barents Sea. The survey is 5,000 sq km, and will be acquired and processed with the l...
Sierra Leone >>  2/7/2019 - GeoPartners, in partnership with the Petroleum Directorate of Sierra Leone, is pleased to announce a new 2D seismic survey offshore Sierra Leone to su...

Norway >>  2/6/2019 - Shearwater GeoServices Holding AS is pleased to announce the award of four Ocean Bottom Seismic (OBS) surveys by Aker BP ASA (“Aker BP”) and Equinor A...
Brazil >>  2/5/2019 - ION Geophysical Corporation announced a new 2D multi-client reimaging program offshore Brazil. The first phase of the Farofa program covers acreage in...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Saudi Arabia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 |

More News

Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.