Gulf Oil and Gas accountACCOUNT

Dana Completes Appraisal Well in Gulf of Suez

Source: www.gulfoilandgas.com 6/29/2012, Location: Africa

Dana Petroleum plc (Dana) is pleased to announce it has just completed a successful appraisal well in the Gulf of Suez area, with Zeitco, our joint venture company.

Within the Lorcan development lease, Fin-2X spudded on 12 May and was drilled with the Sino Tharwa Tanmia 1 rig reaching a total depth of 9,712 feet in the Rudies Formation on 30 May 2012. The Kareem Rahmi sand interval was tested at a constrained rate of 2,220 bbls oil and 1,260 mmscf gas per day. This well encountered the thickest Rahmi reservoir to date in the North Zeit Bay concession, and was tied back into the Lorcan production facility on 24 June 2012.

Drilling News in Egypt >>

Norway >>  12/9/2019 - Equinor Energy AS, operator of production licence 090, has concluded the drilling of appraisal well 35/11-23 A. The well was drilled about 3 kilometre...
Australia >>  12/8/2019 - Norwest Energy has approved a joint venture resolution to drill the EP368 exploration well in H1 2020 at Lockyer Deep. The well location is situated a...

Norway >>  12/8/2019 - The Norwegian Petroleum Directorate has granted ConocoPhillips Skandinavia AS a drilling permit for well 25/7-9 S, cf. Section 15 of the Resource Mana...
Argentina >>  12/4/2019 - Crown Point Energy Inc. provided an operations update on its drilling activities on the Cerro de Los Leones (“CLL”) exploration permit. ...

Australia >>  12/4/2019 - Cooper Energy announces a 4 well appraisal program of the Butlers oil field by the PEL 92 joint venture commenced on 3 December with the spudding of B...
Norway >>  12/4/2019 - Wintershall Dea has drilled the longest well (A36B) ever completed by the company in Norway. Reaching some 9,023 metres from the Brage platform, the w...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Egypt Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 |

Oil & Gas Projects in Egypt >>

More News

Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © 2019 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.