Gulf Oil and Gas accountACCOUNT

Foster Signs Three-Year Statoil Frame Agreement for FEEDs

Source: www.gulfoilandgas.com 12/12/2012, Location: Europe

Foster Wheeler AG announced that a subsidiary of its Global Engineering and Construction Group has signed a three-year frame agreement with Statoil Petroleum AS for the provision of front-end engineering design (FEED) services for future projects at the Karsto and Kollsnes processing plants, located in Norway north of Stavanger and north-west of Bergen, respectively. The frame agreement includes an option for Statoil to extend the agreement for a further two years and for Foster Wheeler to execute concept studies as well as FEEDs.

The value of the agreement was not disclosed. Bookings will be recorded as work is released by Statoil.

The Karsto processing plant plays a key role in the transport and treatment of gas and condensate from twenty-eight fields on the Norwegian continental shelf, which fields are connected to the plant via pipelines. The Karsto complex ranks as the world’s third largest export port for liquefied petroleum gases (LPG) and is the biggest in Europe. The processing plant at Kollsnes treats gas from the Troll, Kvitebjorn and Visund fields in the North Sea, and can handle up to 143 million standard cubic meters per day.

Statoil is acting on behalf of Gassco. Gassco is the operator for the Karsto and Kollsnes processing plants, which are owned by the Gassled joint venture, with Statoil as the technical service provider.

“We have developed an excellent working relationship with Statoil and have been working with them at these facilities under an existing agreement for some time, as well as working with them on other projects, including Snohvit LNG, ” said Umberto della Sala, Chief Operating Officer of Foster Wheeler AG. “We will continue to focus on providing responsive and flexible service, combining our in-depth technical skills and our significant upstream experience and capability to support Statoil in successfully delivering its planned portfolio of projects at Kollsnes and Karsto.”

FEED News in Norway >>

Norway >>  2/11/2019 - Kvaerner has signed a contract with Equinor to study how floating concrete substructures for offshore wind turbines to the planned Hywind Tampen proje...
Australia >>  2/6/2019 - Wood and KBR have secured a new multimillion dollar contract to deliver integrated front-end engineering design (FEED) for Shell Australia’s Crux proj...

Australia >>  2/5/2019 - McDermott International, Inc. (NYSE: MDR) today announced it has signed a contract with Woodside Energy Ltd. to undertake a front-end engineering and ...
Vietnam >>  2/4/2019 - ExxonMobil, with joint venture partners PetroVietnam and PetroVietnam Exploration Production Corporation, is advancing plans for a multi-billion dolla...

Related Categories: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Related Articles: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 


Norway Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 |

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.