Andes Updates Operations on La Brea Block

Source: www.gulfoilandgas.com 1/14/2013, Location: South America

The Board of Andes, the Latin American E&P company, is pleased to give an operational update after the first production optimisation campaign undertaken by the company as operator of the "La Brea" block.

On 20 November 2012 the well PMu-x7 was producing 6 bopd from the Agrio formation prior to a pulling operation. When returned to production, this well reached 100 barrels of oil per day ("bopd") for the first four days then, after a week, dropped to 13 bopd and after a month, production stabilised at this level.

On 3 December 2012 the well PMu-x2, where production was 22 bopd, was worked-over in the Agrio formation. After a month, following the work over, oil production stabilised at 107 bopd.

The results from these operations indicate an Agrio formation with low-oil-permeability indicative of a tight-oil behaviour. When integrated with other field information, it suggests that the Agrio formation could become an important oil producer in a tight-oil formation. Further studies will be conducted to properly address the Agrio Formation reservoir behaviour and the well production decline curves.

Nicolas Mallo Huergo, Chairman of the Company, commented; "The results of this production optimisation campaign shows the potential the "Puesto Munoz" field holds and the quality of the work performed by our technical team. In the northern region of the Neuquen Basin, the Agrio Formation could add several hundred million barrels to the basin resources pool and may have a significant positive impact on Andes's reserves and resources estimates.".

Qualified Person Review
In accordance with AIM guidance for mining, oil and gas companies, Mr. Juan Carlos Esteban has reviewed the information contained in this announcement. Mr. Juan Carlos Esteban, an Officer of the Group, is a petroleum engineer with over 20 years of experience and is a member of the SPE (Society of Petroleum Engineers).


Australia >>  1/20/2025 -  Comet Ridge Limited (ASX:COI) is pleased to advise that the Mahalo East Pilot Production Scheme started-up late last week. ...
China >>  1/20/2025 - CNOOC Limited (the “Company”, SEHK: 00883 (HKD Counter) and 80883 (RMB Counter), SSE: 600938) today announces that Dongfang 29-1 Gas Field Development...

Colombia >>  1/20/2025 - Operated
Colombia
December 2024
Boepd (1): 594 Bopd (1): 418
November 2024
Boepd (1): 698 Bopd (2): 517
Indonesia >>  1/20/2025 -  Jadestone Energy plc (AIM:JSE) (the “Company” and together with its subsidiaries, “Jadestone” or the “Group”), an independent upstream production and...

Libya >>  1/19/2025 - The Chairman and Board of Directors of the National Oil Corporation (NOC) have praised the Arabian Gulf Oil Company (AGOCO) for reaching a significant...
Colombia >>  1/17/2025 - GeoPark Limited (“GeoPark”) (NYSE: GPRK), a leading independent energy company with over 20 years of successful operations across Latin America, annou...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.