Max Petroleum Provides Operational Updates

Source: www.gulfoilandgas.com 5/1/2013, Location: Asia

Max Petroleum Plc, an oil and gas exploration and production company focused on Kazakhstan, is pleased to announce a drilling and operational update regarding its activities in the Blocks A&E Licence in Western Kazakhstan (the “Licence”).

Zhana Makat Field
The ZMA-E5 development well in the Zhana Makat Field has successfully reached a total depth of 871 metres, encountering hydrocarbons in Jurassic sandstone reservoirs in line with expectations. The Company plans to complete the well and then place it on production as soon as practicable. The Zhanros ZJ-20 rig will now move to drill the ZMA-E6 development well in the Zhana Makat Field before moving to Block A to drill the Uytas North Prospect, targeting resource potential of 11 million barrels of oil (“mmbo”) with a current geological chance of success of 24%.

Baichonas West Field
The Company has spudded the BCHW-2 well, the first appraisal well in the Baichonas West Field, which was discovered in September 2012. The initial results of logging and production testing of the BCHW-1 well indicated a commercial discovery with oil in place of approximately 16 mmbo from Jurassic reservoirs with an expected recovery factor of between 20% and 40%. The BCHW-2 well will be drilled with a ZJ-30 rig from our drilling contractor, Zhanros Drilling LLP, to a depth of approximately 1,400 metres.

Sagiz West Field
After drilling the BCHW-2 well, the Company will move the ZJ-30 rig to drill the SAGW-4 appraisal well in the Sagiz West Field. Preliminary mapping of recently acquired high-fold 3D seismic data has confirmed the location of SAGW-4, four km south of the SAGW-3 well, as prospective. If successful, the new well will substantially extend the known productive area of the field. The results of the SAGW-4 well, together with the new seismic data, will be crucial in evaluating a significant portion of the 79.8 mmbo of in-place contingent resources in the field, as well as assisting the Company in the design of the future appraisal and development plan for the field.


Canada >>  1/6/2025 - Journey Energy Inc. ("Journey" or the "Company") is pleased to provide an update on its Duvernay Joint Venture (the "Joint Venture") operations, inclu...
Mongolia >>  1/2/2025 - ? Pilot Production wells and facilities operated close to 100% uptime during December 2024
? Gas production from original three pilot wells (LF-...


United States >>  12/31/2024 - 88 Energy Limited (ASX:88E, AIM:88E, OTC:EEENF) (88 Energy, 88E, or the Company) is pleased to provide an update on Project Phoenix’s joint venture pa...
Pakistan >>  12/24/2024 - Oil & Gas Development Company Limited (OGDCL) is pleased to announce the successful revival of Dars West-2 Well, achieving hydrocarbon production from...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.