Gulf Oil and Gas accountACCOUNT

Testing and Production of 3rd Well of Phase-III of Kharsang Field

Source: www.gulfoilandgas.com 5/31/2013, Location: Asia

Jubilant is pleased to announce that KSG#67 (previously referred to as KPL-3E-6), the third of the six development wells of the Phase-III-Extension drilling campaign in the Kharsang Field, Arunachal Pradesh, has successfully tested for oil and has been put into production at an initial gross rate of 75 barrels of oil per day (“bopd”).

KSG#67 was an infill development well in the central part of the Kharsang Field with the H-00 reservoir sand layer as the primary objective and G-00 and I-00 reservoir sand layers as secondary objectives. The well, spud on 20 April 2013, was successfully drilled to a target depth of 1,050 metres Measured Depth (“MD”) (1,028 metres True Vertical Depth) and completed on 18 May 2013.

Based on the wireline log interpretation, mud log shows and formation pressure data from the Reservoir Dynamic Tester, the Consortium identified total net pay of 19 metres, out of which 16.4 metres appears to be oil bearing. Detailed testing was carried out in the deepest oil bearing sand in the interval 992-997 metres, which commenced from 19 May 2013, and the well is currently producing at a rate of around 75 bopd on intermittent self flow. An up-hole potential of approximately 11.4 metres of net oil bearing sands and 2.6 metres of gas/high GOR oil bearing sands have also been identified in the well.

GeoEnpro Petroleum Ltd., a joint venture between GeoPetrol and Jubilant Enpro (a member of the wider Jubilant Bhartia Group), is the Operator of the Kharsang Field. Jubilant holds a 25 percent interest in the block through its subsidiary, Jubilant Energy (Kharsang) Pvt. Ltd. The other members of the consortium are Oil India Ltd. and GeoPetrol.

Logging, Perforating, Testing >>

Logging, Perforating, Testing News in India >>

Russia >>  3/20/2019 - McDermott International, Inc. has been awarded a large* technology contract for the basic engineering and licensing of Irkutsk Oil Company's (IOC) 650...
Azerbaijan >>  3/13/2019 - Contract signature ceremony for the drilling services between Caspian Drilling Company Ltd. (CDC) and Norwegian Equinor Azerbaijan Karabakh BV (Equino...

Kazakhstan >>  3/12/2019 - KAZAJSC NC "KazMunayGas” and Eni Isatay B.V. signed the Joint Operating Agreement (JOA) and the Carry Agreement (CA) for the purpose of joint implemen...
Russia >>  3/5/2019 - Total announces that it has signed the definitive agreements with Novatek for the acquisition of a direct 10% interest in Arctic LNG 2, a major liquef...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


India Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 |

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.