AGR Signed Deal to Use Riserless Mud Recovery Services off Sakhalin

Source: www.gulfoilandgas.com 6/13/2013, Location: Asia

A LEADING operator has signed USD3m deal to use Riserless Mud Recovery services (RMR) from AGR Enhanced Drilling. These services will be used off Sakhalin, Russia, over this year’s summer drilling season.

The operating company is using RMR to help drilling operations in an area that has challenging top-hole conditions and stringent environmental regulations.

RMR enables operators to use weighted mud during top-hole drilling. All mud and cuttings are returned to the rig, with no discharge to the sea. The result is a safer, more stable top-hole, drilled with minimal environmental impact.

RMR and its sister technology CTS (Cuttings Transportation System) have together been deployed on more than 500 wells worldwide to date.

Enhanced Drilling’s EVP, David Hine, said: “RMR has been used with great results previously off Sakhalin - we very much look forward to continuing the RMR success story with this latest project.

“This contract win is a further testament to the quality of our technology, services and people.”

Last year, Norway-based Enhanced Drilling built on its reputation for step-change technological solutions with the introduction of the EC-Drill Managed Pressure Drilling system, which was used on three deep-water wells in the Gulf of Mexico.

For more information about related Opportunities and Key Players visit Caspian Region Projects


Russia >>  6/16/2022 - Enel S.p.A. ("Enel") informs that the agreements related to the sale of its entire stake in the share capital of PJSC Enel Russia (“Enel Russia”) have...
South Korea >>  6/13/2022 - CGG announced that Sercel has sold a complete marine seismic acquisition system to HJ Shipbuilding & Construction, a South Korean shipbuilding leader....

Kazakhstan >>  6/7/2022 - Chevron Corporation (CVX), through its subsidiary Chevron Munaigas Inc. (Chevron), and JSC NC “KazMunayGas” (KMG) have announced a memorandum of under...
Russia >>  5/31/2022 - As of the end of the working day on May 30, Gazprom Export did not yet receive a payment from GasTerra B.V. for the gas supplied in April, which was t...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.