Gulf Oil and Gas accountACCOUNT

Lukoil Selects Contractors for 2nd Construction Stage at V.Filanovsky Field

Source: www.gulfoilandgas.com 7/10/2013, Location: Asia

LUKOIL has announced a bidding procedure for contractors to conduct construction operations as part of the second stage at Vladimir Filanovsky field located in the Caspian Sea.

The bidding documentation provides for construction of an ice-resistant stationary platform (IRP-2), living quarters platform (LQP-2), and a 60-m catwalk bridge.

The IRP-2 drilling complex shall be employed to drill a pad consisting of 15 directional wells with a horizontal borehole ending, including nine production wells and six injectors. The LQP-2 shall accommodate 55 persons and include a helicopter pad.

The IRP-2 shall be connected to the riser block mounted during the first construction stage at Vladmir Filanovsky field, via a 6-km multiphase subsea pipeline.

IRP-2 and LQP-2 are to be commissioned in autumn 2016, while hydrocarbon production as part of the second stage of Vladimir Filanovsky field is to begin in 2017.

Offshore Platforms News in Russia >>

Azerbaijan >>  8/19/2019 - Petrofac, in a joint venture (JV) with the State Oil Company of the Republic of Azerbaijan (SOCAR), has secured an Engineering and Technical Services ...
India >>  8/19/2019 - INTECSEA Inc, a wholly owned subsidiary of Worley, has been awarded a project management consultancy (“PMC”) contract by Reliance Industries Limited (...

China >>  8/12/2019 - China based offshore and subsea solutions company, COOEC Offshore, has formed an alliance with international oilfield services company, Expro. The for...
India >>  8/6/2019 - BP and Reliance Industries Limited (RIL) have agreed to form a new joint venture that will include a retail service station network and aviation fuels...

Russia >>  8/2/2019 - Saipem has reached an agreement with Technip France and NIPIgaspererabotka to participate in the Joint Venture for the realization of the Arctic LNG 2...
China >>  7/29/2019 - TechnipFMC celebrated the first steel cut of the manifolds and subsea structures for CNOOC’s Liuhua 16-2 Oilfields Development Project recently. The m...

Related Categories: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 

Related Articles: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 


Russia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 |

Oil & Gas Projects in Russia >>

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.