Gulf Oil and Gas accountACCOUNT

Russia First Subsea Production Facility Successfully Tested in Kirinsky Field

Source: www.gulfoilandgas.com 10/23/2013, Location: Asia

The Onshore Processing Facility (OPF) of the Kirinskoye gas and condensate field in the Sakhalin Region hosted an official ceremony dedicated to the first gas production and its transmission system testing.

Taking part in the ceremony were Alexey Miller, Chairman of the Gazprom Management Committee, Yury Trutnev, Deputy Prime Minister of the Russian Federation and Presidential Plenipotentiary Envoy to the Far Eastern Federal District, Alexander Novak, Russian Minister of Energy, Alexander Khoroshavin, Governor of the Sakhalin Region as well as heads of Gazprom's relevant units, subsidiaries and contracting companies.

The command to launch gas production was given by Russian President Vladimir Putin.

The Kirinskoye field is located in the Sea of Okhotsk, 28 kilometers off the shore. For the first time in Russia a subsea production facility is installed here. The key element of the system is placed at a depth of 90 meters and comprised of several high-pressure pipelines fixed to a single base and connected under a specific pattern. The manifold gathers the produced gas, which is then conveyed via a subsea pipeline to the OPF. After being treated at the OPF, the gas is transferred via a 139-kilometer gas pipeline to the main compressor station of the Sakhalin – Khabarovsk – Vladivostok gas transmission system.

The subsea production facility makes it possible to produce hydrocarbons in severe climatic conditions, even under ice, with no platforms or other above-water facilities required. When designing the facility, Gazprom took into account the seismic activity in the region, and that is why the equipment is resistant to earthquakes with magnitudes of up to 9 points.

A novel semi-submersible drilling rig – Polyarnaya Zvezda (Polar Star) – owned by Gazprom and constructed on the Company's request at Vyborg Shipyard is used for constructing wells in the Kirinskoye field. This drilling rig of the latest – sixth – generation is designed for operation in the Arctic conditions as cutting-edge technologies and equipment were used for its construction.

By now, one production well is ready and six more are planned to be built in the field. Once the nominal capacity is reached, gas production will amount to 5.5 billion cubic meters a year. The Kirinskoye OPF is meant to receive gas not only from the Kirinskoye field, but eventually from other fields of the Sakhalin III project as well.

In order to preserve Sakhalin's unparalleled ecosystem Gazprom strictly adheres to Russian and international environmental standards while pre-developing and operating the Kirinskoye field. For instance, the Company consistently monitors the environmental situation there.

“For the first time in the Russian gas industry a subsea production facility was constructed to develop a field in the Russian continental shelf. The experience gained by Gazprom at the Kirinskoye field will be used for developing other Russian offshore fields.

Subsea production technologies proved to be efficient, reliable and safe. Their application makes it possible to considerably mitigate environmental impacts,” said Alexey Miller.

For more information about related Opportunities and Key Players visit Caspian Region Projects

Production News in Russia >>

Peru >>  8/21/2019 - PetroTal Corp. ("PetroTal")(TAL and AIM: PTAL) is pleased to provide an update in respect of its operations and production at the Bretana field in Blo...
Canada >>  8/16/2019 - Following an extensive investigation, flow line repairs, integrity testing and approval of the Canada-Newfoundland and Labrador Offshore Petroleum Boa...

Iraq >>  8/15/2019 - Gazprom Neft subsidiary Gazpromneft-Badra has now produced 13.5 million tonnes — or 100 million barrels — of oil. ...
Egypt >>  8/14/2019 - Natural gas production at Zohr, the largest gasfield in the Mediterranean Sea, more than tripled in the first half this year to reach 11.3 billion cub...

Russia >>  8/14/2019 - Exillon Energy plc (Exillon Energy), a London Premium listed oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") ...
Nigeria >>  8/1/2019 - Eland Oil & Gas PLC, an oil & gas production and development company operating in West Africa with an initial focus on Nigeria, is pleased to announce...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Transportation, 4X4 Trucks  Utility Systems  Water Supply Services  Welding Products/Services 


Russia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 |

Oil & Gas Projects in Russia >>

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.