Gulf Oil and Gas accountACCOUNT

NuEnergy Provides Updates on Pilot # 2 Well

Source: www.gulfoilandgas.com 11/20/2013, Location: Asia

NuEnergy Gas Limited updated on the drilling progress for its second Pilot production well at the Muara Enim Production Sharing Contract (PSC) area in South Sumatra, Indonesia.

· Pilot Well # 2 has been successfully drilled to the Target Total Depth of 2,631 feet (802 meters)
· Coals have now been logged and a total of 150 feet (46 meters) of net coal seams have been identified
· Logs of the Suban J seam confirmed over 42 feet (13 meters) of continuous coal
· The well is being prepared for 7 inch casing and completions for the section from feet 2,004 to 2,631 feet (611 to 802 meters)
· The coal seams of Pilot Well # 2 will now be completed using three completion techniques:
- Radial jetting of the upper Magnus coal seams extending lateral completions of between 98 to 164 feet (30 and 50 meters)
- "Fishbone" completions generating eight 41 foot (12.5 meter) perforations supported by titanium alloy spurs; and
- Slotted liner casing,

to maximize the water and gas productivity of all coal seams

· The pilot production site is currently being prepared for connection of the two pilot wells ahead of pre plan of development approval which will enable early gas sales

Drilling News in Indonesia >>

Australia >>  5/21/2019 - JV partner Carnarvon Petroleum has provided an update on the drilling of the Santos-operated Dorado-2 well. Since the last report the 12-1/4” hole has...
Egypt >>  5/21/2019 - Dana Gas PJSC, the Middle East's largest regional private sector natural gas company, has commenced drilling operations on 20 May at its Merak-1 well,...

Norway >>  5/15/2019 - Norway's Petroleum Safety Authority has given Aker BP consent to drill exploration well 15/6-16 S, with options for a sidetrack and testing. The well ...
Colombia >>  5/14/2019 - Amerisur Resources, the oil and gas producer and explorer focused on South America, has provided an update on operations in Colombia ahead of its annu...

Norway >>  5/14/2019 - The Norwegian Petroleum Directorate has granted Lundin Norway a drilling permit for wildcat well 16/1-31 A in production licence PL 338. Well 16/1-31 ...
Scotland >>  5/14/2019 - Siccar Point Energy (‘Siccar Point’) has completed drilling the Blackrock exploration well 204/5b-2 in the West of Shetland. The well was drilled wit...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Indonesia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |

Oil & Gas Projects in Indonesia >>

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.