Gulf Oil and Gas accountACCOUNT

Hardman Provides Uganda Flow Testing Update

Source: www.gulfoilandgas.com 8/8/2006, Location: Africa

Hardman Resources Limited announceed that flow testing commenced on the Mputa-1 discovery well in Block 2. Tests of three intervals are planned at this location. Operations commenced with a speculative test on the fractured granite basement play where hydrocarbons were encountered during drilling. This test recovered only minor amounts of oil, likely due to a restricted and tight fracture system.

The two principal tests aim to confirm fluid characteristics and flow potential of oil bearing sand intervals similar to those successfully tested at Waraga-1 in the last quarter. The testing of the first of two sand intervals should commence towards the end of this week.

Equities in Block 2 are:
Hardman Petroleum Africa Pty Ltd (Operator) 50.0%
Tullow Oil 50.0%

Testing >>

Testing News in Uganda >>

Algeria >>  5/17/2019 - Eni and Sonatrach have signed agreements to renew the gas supply contract to import Algerian gas into Italy until 2027 (plus two further optional year...
Mozambique >>  5/14/2019 - Mozambique Rovuma Venture said that the government of Mozambique had approved its development plan for the Rovuma LNG project, which will produce, liq...

Nigeria >>  1/7/2019 - Penspen, a leading global provider of engineering and project management services to the energy industry, is pleased to announce that it has been awar...

Related Categories: General  Hydrostatic Testing  Inspection  Laboratory Services  Non Destructive Testing  Testing 

Related Articles: General  Hydrostatic Testing  Inspection  Laboratory Services  Non Destructive Testing  Testing 


Uganda Oil & Gas 1 >>  2 | 3 |

Oil & Gas Projects in Uganda >>

More News

Related Links

AO BJ BW CD CG CI CM DZ EG EH ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.