Gulf Oil and Gas accountACCOUNT

Statoil Completes Drilling of 7324/8-1 Well

Source: www.gulfoilandgas.com 6/20/2014, Location: Europe

Statoil Petroleum AS, operator of production licence 615, has completed the drilling of wildcat well 7324/2-1. The well was drilled about 45 kilometres north of the 7324/8-1 "Wisting Central" discovery, and 350 kilometres north of Hammerfest.

The primary exploration target for the well was to prove petroleum in reservoir rocks from the Middle Jurassic to Late Triassic Age (the Realgrunnen sub-group).

The secondary exploration target was to prove petroleum in reservoir rocks from the Late Triassic Age (the Snadd formation).

Well 7324/2-1 encountered reservoir rocks about 15 metres thick and with good reservoir quality, in the St? formation in the Realgrunnen sub-group. In the Snadd formation, about 170 metres of reservoir rocks were encountered, with mostly poor reservoir quality and just a few metres with good reservoir quality. The well is dry.

Data acquisition and sampling have been carried out.

This is the first exploration well in production licence 615. The licence was awarded in the 21st licensing round in 2011.

The well was drilled to a vertical depth of 1050 metres below the sea surface, and was terminated in the Snadd formation from the Late Triassic. Water depth at the site is 443 metres. The well has been permanently plugged and abandoned.

Well 7324/2-1 was drilled by the Transocean Spitsbergen drilling facility, which will now drill wildcat well 7325/1-1 in the same production licence.

Drilling News in Norway >>

Botswana >>  2/12/2019 - Tlou Energy Limited, the ASX, AIM and BSE listed company focused on delivering power in Botswana and southern Africa through the development of coal b...
Norway >>  2/12/2019 - Equinor Energy AS, operator of production licence 857, has concluded the drilling of wildcat well 7132/2-1. The well was drilled about 175 kilometres ...

United Kingdom >>  2/8/2019 - Angus Energy, a leading UK conventional oil and gas production and development company, has submitted an application for an extended well test at Balc...
Iraq >>  2/7/2019 - LUKOIL commenced drilling of new production wells at West Qurna-2 field as part of the second development phase. The company has so far concluded cont...

Norway >>  2/6/2019 - The Norwegian Petroleum Directorate has granted Aker BP ASA a drilling permit for wells 24/9-15 S and 24/9-15 A, cf. Section 15 of the Resource Manage...
United Kingdom >>  2/6/2019 - United Oil & Gas Plc has been notified by Corallian Energy Limited (‘Corallian’), the operator of the P1918 licence in the Wessex Basin, that the Colt...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Norway Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 |

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.