Gulf Oil and Gas accountACCOUNT

Amni and Afren announce successful completion of operations on the Okoro-3 well in Nigeria

Source: www.gulfoilandgas.com 11/23/2006, Location: Africa

AMNI International Petroleum Development Company Limited ("AMNI") and Afren plc ("Afren” or "the Company") announce the successful results of the Okoro-3 well offshore Nigeria. Amni and Afren are pleased to announce the successful completion of operations on the Okoro-3 well in Nigeria.

Okoro-3 is the first well to be drilled by Afren/Amni on OML 112 in the shallow water Niger Delta. Okoro-3 is a vertical appraisal well on the Okoro Field which was discovered by the Okoro-1 well in 1973. Okoro-1 found oil in two separate Agbada Formation sands between 4,900 and 5,550 feet. The Okoro-3 well was designed to evaluate the eastern extent of the field and acquire the full data suite, in particular fluid samples, which are essential for development planning.

The well commenced on 14th October and was drilled to total depth of 6,500ft in the Miocene Agbada Formation. The well confirmed the eastern extension of the field and also the hydrocarbon contacts seen in both sand formations in the initial discovery. A 30ft interval in the Upper sand was tested and oil samples were taken that have confirmed the well productivity potential and other key reservoir properties.

Flowing tubing head pressures and other Petroleum Engineering data recorded during the test, indicate that estimated production capacity for a completed production well would be in excess of 4,000 barrels of oil per day.

Following completion of testing operations, a second appraisal well will be drilled on the Okoro Field. The well will be drilled as a deviated sidetrack from the Okoro-3 wellbore and is designed to further evaluate both reservoirs and provide greater control for planning future horizontal production wells. The sidetrack programme is expected to take approximately 15 days.

The pre-drill range of reserves for the Okoro-Setu development project were 20 mmbbls Proven (P1) and 35 mmbbls Probable (P2) reserves. Initial post well analysis of Okoro-3 results indicates that the revised range of reserves for the Okoro-Setu project is now 35 mmbbls Proven (P1), an increase of 75%, and 40 mmbbls Probable (P2).

Development drilling on both the Okoro and Setu Fields is scheduled to commence in Q3 2007 with the Global Santa Fe Adriatic VI drilling unit and field development planning is currently on schedule for first oil in early 2008.

Drilling News in Nigeria >>

Brazil >>  3/30/2020 - Petro-Victory Energy Corp. is pleased to provide the market with a drilling and operational update across the Company’s portfolio of assets in Brazil....
Australia >>  3/26/2020 - Falcon Oil & Gas has provided an operational update on the Beetaloo project in the Northern Territory, Australia in light of COVID-19. Following the s...

Bahamas >>  3/25/2020 - Bahamas Petroleum Company, the oil and gas exploration company with significant prospective resources in licences in The Commonwealth of The Bahamas, ...
Gabon >>  3/25/2020 - VAALCO Energy, Inc. provided an update on the successful completion of its 2019/2020 drilling program as well as an operational update. ...

Gambia >>  3/25/2020 - FAR Limited has implemented plans to ensure business continuity and preserve the Company’s cash (~A$150M at end of February 2020) in the wake of the C...
Egypt >>  3/19/2020 - SDX Energy Plc (SDX), the MENA-focused oil and gas company, is pleased to provide the following update on its drilling operations in Morocco and Egypt...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Nigeria Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 |

Oil & Gas Projects in Nigeria >>

More News

Related Links

AO BJ BW CD CG CI CM DZ EG ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.