Gulf Oil and Gas accountACCOUNT

Det Norske Completes Drilling of Well 2/9-5S

Source: www.gulfoilandgas.com 8/29/2014, Location: Europe

Det norske oljeselskap ASA, as operator of production license 494, has completed the drilling of wildcat well 2/9-5S. The well was drilled about 30 km east of the Valhall field on the Heimdalsho prospect.

2/9-5S was the first well to test a new play concept in the Mandal High area, where Johan Sverdrup and Utsira High is the analogue.

The purpose of the well was to prove petroleum in Upper Jurassic reservoir rocks and secondary to prove sandstones with hydrocarbons in the pre-Jurassic rocks.

The well encountered a few thin sandstones with reservoir quality in the main target and only few and thin sandstones in the secondary target. No traces of hydrocarbons were proven.

2/9-5S is the first exploration well in production license 494, awarded in the APA2008. The well was drilled to a vertical depth of 3,525.5 meters below sea level (3,587 meters MDRKB) and was completed in rocks expected to be of Permian age. The water depth is 65 meters.The well will now be permanently plugged and abandoned.

Well 2/9-5S was drilled by the drilling rig Maersk Giant, which will now go to the Yme field operated by Talisman.

Det norske oljeselskap ASA is the operator of the license with a 30 percent working interest. Other partners are Dana Petroleum with 24 percent, Fortis Petroleum with 16 percent, Spike Exploration with 15 percent and Tullow Oil with 15 percent.

Drilling News in Norway >>

Norway >>  7/9/2020 - Petroleum Safety Authority has given Aker BP consent to use the Maersk Invincible mobile drilling facility for drilling of a pilot hole on the Hod fie...
Norway >>  7/9/2020 - Reference is made to the stock notices on 17 June and on 3 July. The licence has decided to drill a side-track well to further evaluate the size of th...

Cuba >>  7/8/2020 - Melbana Energy Limited has received its first payment from Sonangol in the amount of EUR425,000, pursuant to the Farm-in Agreement executed last m...
Norway >>  7/8/2020 -  Equinor, operator of production licence PL 878, is in the process of concluding the drilling of wildcat well 30/2-5 S. The well was drilled about 17 ...

Norway >>  7/7/2020 - Equinor has awarded a letter of intent with Odfjell Drilling for the drilling and completion of Sverdrup Phase 2 with Deepsea Atlantic. The letter of ...
Pakistan >>  7/7/2020 - Jura Energy Corporation announced that the drilling of Umair NW - 01 exploratory well has commenced in the Guddu Block. The projected depth of the wel...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Norway Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |

More News

Related Links

Gulf Oil and Gas
Copyright 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.