Premier Installed Solan Facilities

Source: www.gulfoilandgas.com 9/10/2014, Location: Europe

Premier is pleased to announce that the Solan subsea oil storage tank, jacket and topsides have been successfully installed. The offshore hook up and commissioning programme will now commence. Precise timing of first oil from the Solan field will depend upon the progress of this next phase.

Tony Durrant, CEO, commented:
“We are very pleased to have successfully installed the Solan facilities within two and a half years of receiving approval from the UK government. This achievement was only made possible by the co-operation and skills of the teams and contractors involved.”


Norway >>  5/9/2022 - The Petroleum Safety Authority Norway (PSA) has given Equinor Energy AS (Equinor) consent to use a water injection facility at Gudrun.

Oper...

United States >>  5/5/2022 - Petrofac, a leading provider of services to the global energy industry, and Promethean Decommissioning Company (PDC), a pure-play Decommissioning Oper...

United States >>  5/2/2022 - A pioneering joint development project (JDP) to advance carbon-reduction technologies between ABS and Hyundai Heavy Industries Group (HHI Group) has t...
United Kingdom >>  4/22/2022 - - First job for Pioneering Spirit’s Jacket lift system
- Single-lift removal and transport of 8100-tonne Ninian Northern jacket
- Revolutio...


Related Categories: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 

Related Articles: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.