Gulf Oil and Gas accountACCOUNT

P-66 Hull Goes to Integration in Angra Dos Reis

Source: www.gulfoilandgas.com 12/9/2014, Location: South America

Petrobras began transporting the hull of P-66, the first platform in a series of eight 'replicant' FPSOs (floating production, storage and offloading units) being constructed to meet oil production demands in Brazil. This is the first FPSO hull completely built in the country.

Having left the Rio Grande 1 shipyard, located in the city of Rio Grande, state of Rio Grande do Sul, the first replicant hull is now on its way to the Brasfels shipyard, in Angra dos Reis, Rio de Janeiro, where it is expected to arrive on December 18. At Brasfels, the modules will be installed on the hull, and equipment and systems will be integrated, interconnected and tested.

P-66 will be deployed in the Lula field, on the Lula South module, in the pre-salt layer of Santos Basin, operated by Petrobras (65%) in partnership with BG E&P Brasil (25%) and Petrogal Brasil (10%).

For more information about related Opportunities and Key Players visit Brazil Oil and Gas Projects

FPSO Vessels and Equipment News in Brazil >>

Mexico >>  7/18/2019 - Solstad Offshore ASA (SOFF) and Subtec S.A has agreed to extend the contract for the CSV "Far Sentinel" with 2,5 years. The vessel operates in Mexico....
Nigeria >>  7/16/2019 - Keppel Offshore & Marine Ltd has through its wholly-owned subsidiaries, Keppel FELS Limited (Keppel FELS) and Keppel Shipyard Ltd (Keppel Shipyard), s...

Norway >>  7/15/2019 - Golden Energy Offshore Services AS (GEOS-ME) is pleased to inform that a contract extension has been secured for Energy Swan and Energy Scout. ...
United Kingdom >>  7/11/2019 - Fugro has successfully provided remote positioning services onboard a floating production storage and offloading (FPSO) vessel for Bluewater during a ...

United Kingdom >>  7/9/2019 - The technology group Wartsila has achieved a new technology benchmark with the introduction of the marine sector’s first hybrid installation for a bul...
United Kingdom >>  7/8/2019 - GC Rieber Shipping has entered into a time charter agreement with a European offshore client for the CSV vessel Polar Queen for a period of about 5 mo...

Related Categories: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 

Related Articles: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 


Brazil Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 |

Oil & Gas Projects in Brazil >>

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.