Gulf Oil and Gas accountACCOUNT

NISOC Implementing 8 Geological Projects in Iran

Source: www.gulfoilandgas.com 4/20/2015, Location: Asia

Implementing 8 geology projects across NISOC operational territory has made 56% headway up to now, announced Deputy Technical Manager in Geology Department.

Saying that these projects include petrography studies, Sedimentology, and electrophoresis, Farokh Nasesi added, these plans are now being implemented on Koupals's Asmari reservoir and have made 70% physical headway up to now.

He noted tat two other geological plans are now underway in Mansouri oilfield with 90 and 86% physical headway , 2% ahead of scheduled program.

As the largest oil producer NISOC output accounts for 80% of total produced oil in Iran.

Geological and Geophysical News in Iran >>

Azerbaijan >>  4/16/2019 - Turan Drilling & Engineering Company LLC (A KCA Deutag and SOCAR AQS Company) has been awarded its first contract, which is with BP Exploration (Caspi...
Russia >>  4/10/2019 - Zvezda Shipbuilding Complex and Sovkomflot PJSC have signed a contract to make a pilot gas carrier vessel for the Arctic LNG 2 project. The contract s...

India >>  4/8/2019 - Axens’ Technologies for HPCL Rajasthan Refinery in HPCL Rajasthan Refinery Limited (HRRL), a joint venture company between HPCL and the Government of ...
China >>  4/5/2019 - Woodside has signed a Heads of Agreement (HOA) with ENN Group for the sale of 1.0 million tonnes of LNG per annum from Woodside’s portfolio for a per...

Russia >>  4/2/2019 - During the 19th International Conference & Exhibition on Liquefied Natural Gas (LNG2019) in Shanghai, Novatek Gas & Power Asia, a trading subsidiary o...
Indonesia >>  3/25/2019 - TechnipFMC has been awarded a large(1) integrated Engineering, Procurement, Construction, Transportation and Installation (iEPCI) contract by Eni for ...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Iran Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 |

Oil & Gas Projects in Iran >>

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.