Triple Energy Provides Update on Niaoshan-1 Well

Source: www.gulfoilandgas.com 7/21/2015, Location: Asia

The Directors of Triple Energy Limited provide the following update on activities at the Niaoshan-1 well currently underway in the Bird Mountain area of the Company's Aolong Joint Venture project in the People's Republic of China.

As of 8am on 20 July 2015 the well had reached a depth of 367 metres (measured depth) and was drilling ahead.

Niaoshan-1 was spudded in the Bird Mountain area on 28 June 2015 and is the first of 2 wells being drilling during 2015. The well is located around 2 kilometres from the previous Xian Xian-1 well drilled by the Joint Venture in 2013. The well is targeting several major coal seams for intersection which will be cored for desorption analysis and tested.

The well is planned to be drilled to a depth of approximately 1,300 metres.

The second well of 2015 will follow with the same rig once operations at Niaoshan-1 are complete. Further updates will continue to be made on a weekly basis during drilling and as material developments occur.


Australia >>  7/5/2022 - The Palm Valley 12 (PV12) well in OL3, southwest of Alice Springs in the Northern Territory, was at a depth of 2,335m in the P4 unit of the Pacoota Fo...
Brazil >>  7/5/2022 - A 540-day drilling contract with a start date of 2023 has been given to Valaris, represented by Ensco UK Drilling Limited and Ensco do Brasil Petróleo...

Canada >>  7/5/2022 - The Mobile Offshore Drilling Unit (MODU) Stena ICEMAX has a new contract with BP Canada Energy Group ULC, which Stena Drilling is happy to announce....
Indonesia >>  7/5/2022 - The second of the company's two back-to-back producing wells is where drilling activities have started, according to Indonesia Energy Corporation Limi...

Norway >>  7/4/2022 - The Norwegian Petroleum Directorate (NPD) has granted Neptune Energy Norge AS drilling permit for well 35/6-3 S, cf. Section 13 of the Resource Manage...
Norway >>  7/4/2022 - The Norwegian Petroleum Directorate (NPD) has granted OMV (Norge) AS drilling permit for well 30/5-4 S, cf. Section 13 of the Resource Management Regu...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.