Triple Energy Provides Niaoshan-1 Well Update

Source: www.gulfoilandgas.com 8/4/2015, Location: Asia

The Directors of Triple Energy Limited (TNP) provide the following update on activities at the Niaoshan-1 well currently underway in the Bird Mountain area of the Company's Aolong Joint Venture project in the People's Republic of China.

As of 8am on 3 August 2015 the well had reached a depth of 671 metres (measured depth) and was drilling ahead.

Niaoshan-1 was spudded in the Bird Mountain area on 28 June 2015 and is the first of 2 wells being drilling during 2015. The well is located around 2 kilometres from the previous Xian Xian-1 well drilled by the Joint Venture in 2013. The well is targeting several major coal seams for intersection which will be cored for desorption analysis and tested.

The well is planned to be drilled to a depth of approximately 1,300 metres.

The second well of 2015 will follow with the same rig once operations at Niaoshan-1 are complete. Further updates will continue to be made on a weekly basis during drilling and as material developments occur.


Russia >>  6/16/2022 - Enel S.p.A. ("Enel") informs that the agreements related to the sale of its entire stake in the share capital of PJSC Enel Russia (“Enel Russia”) have...
South Korea >>  6/13/2022 - CGG announced that Sercel has sold a complete marine seismic acquisition system to HJ Shipbuilding & Construction, a South Korean shipbuilding leader....

Kazakhstan >>  6/7/2022 - Chevron Corporation (CVX), through its subsidiary Chevron Munaigas Inc. (Chevron), and JSC NC “KazMunayGas” (KMG) have announced a memorandum of under...

Related Categories: Coalbed Methane  General  Heavy Oil  Methane Clathrate  Oil Sands  Oil Shale  Shale Gas  Tight Gas  Tight Oil 

Related Articles: Coalbed Methane  General  Heavy Oil  Methane Clathrate  Oil Sands  Oil Shale  Shale Gas  Tight Gas  Tight Oil 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.