Gulf Oil and Gas accountACCOUNT

Interruption of the Flow of Crude Oil on the 12’’Pipeline in Gabon

Source: www.gulfoilandgas.com 9/4/2015, Location: Africa

MAUREL & PROM has been notified by the Association Coucal, operator of the 12’’ pipeline, of a force majeure situation leading to an interruption of the flow of crude oil in the section between Coucal and the junction with the 18-inch Rabi Nord pipeline.

This situation, resulting from a break in the 12-inch pipeline in a forested area 2.5 km from Coucal, has led to Maurel & Prom Gabon completely shutting down its production.

According to the operator, production should resume within a week at the latest. The current production capacity of the Ezanga permit producing fields (M&P operator, 80%) is around 29,000 bopd. The Group will inform its shareholders when production resumes.

For more information about related Opportunities and Key Players visit West Africa Projects

Oil and Gas Pipeline >>

Oil and Gas Pipeline News in Gabon >>

Nigeria >>  5/13/2020 -  Saipem, in joint venture with Daewoo E&C Co. Ltd and Chiyoda Corporation (SCD JV), has been awarded by Nigeria LNG Limited the contracts for the Engi...
Algeria >>  5/4/2020 - SONATRACH and the Russian company LUKOIL proceeded to the signing of a memorandum of understanding (MoU) to initiate discussions in order to identify ...

Related Categories: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 

Related Articles: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 


Gabon Oil & Gas 1 >>  2 | 3 | 4 |

More News

Related Links

Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.