Triple Provides Drilling Activities Update in Bird Mountain Area

Source: www.gulfoilandgas.com 10/12/2015, Location: Asia

The Directors of Triple Energy Limited provide the following update on the drilling activities on the Company’s Aolong Joint Venture project in the People’s Republic of China.

NIAOSHAN-1 WELL
Casing at the Nioshan-1 well has now been set and a decision on further operations will be made once core analysis results are received.

YIXIN-1 WELL
As of 10.00 am on 12 October 2015 the Yixin-1 well was at 671 meters (measured depth) and was drilling ahead.


Russia >>  6/16/2022 - Enel S.p.A. ("Enel") informs that the agreements related to the sale of its entire stake in the share capital of PJSC Enel Russia (“Enel Russia”) have...
South Korea >>  6/13/2022 - CGG announced that Sercel has sold a complete marine seismic acquisition system to HJ Shipbuilding & Construction, a South Korean shipbuilding leader....

Kazakhstan >>  6/7/2022 - Chevron Corporation (CVX), through its subsidiary Chevron Munaigas Inc. (Chevron), and JSC NC “KazMunayGas” (KMG) have announced a memorandum of under...

Related Categories: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Hoisting Systems  Lubricating Equipment 

Related Articles: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Hoisting Systems  Lubricating Equipment 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.