Gulf Oil and Gas accountACCOUNT

Technip Awarded MSA for SCT&E LNG’s Monkey Island Project

Source: www.gulfoilandgas.com 7/21/2016, Location: North America

Technip was awarded a Master Services Agreement (MSA) by SCT&E LNG, Inc. for their proposed 12 mtpa Liquefied Natural Gas (LNG) export terminal located on Monkey Island, in Cameron Parish, Louisiana, USA.

The MSA will be utilized to execute engineering services necessary to develop the project including the Front End Engineering Design (FEED) and supporting the Federal Energy Regulatory Commission (FERC) process.

The total liquefaction capacity for the SCT&E LNG project is 12 mtpa and will be achieved through three identical 4 mtpa natural gas liquefaction trains, with the necessary utilities, storage, and marine facilities.

Technip’s operating center in Houston, Texas, USA, will execute the contract.

Harvey Vigneault, Technip North America’s Chief Operating Officer for the Onshore Business Unit, stated: “We are very proud to have been selected to support SCT&E LNG in their significant project venture. Our experienced team of LNG and project professionals will utilize their extensive experience and expertise to place the Monkey Island LNG project in the best position moving forward. This award will add to Technip’s depth of recent projects the company has participated in along the U.S. Gulf Coast region, as well as strengthen its longstanding leadership position in LNG projects globally.”

Greg Michaels, Chairman and CEO of SCT&E LNG, added, “Technip has over 50 years of LNG experience, which includes the first baseload LNG liquefaction project. Overall, their extensive experience, especially in recent U.S. Gulf Coast LNG projects, and their assigned project team were key factors in our decision to select Technip. They are a great addition to our project, and their involvement supports our business model of only working with proven and experienced LNG contractors.”

FEED News in United States >>

Norway >>  5/26/2020 - Saipem has signed a two-year frame agreement with Equinor covering engineering services worldwide. The Frame Agreement encompasses feasibility and con...
Australia >>  5/19/2020 - Emperor Energy and APA Group have entered into a Binding Agreement to progress with the Pre-Front End Engineering Design (Pre-FEED) for the provision ...

Canada >>  5/19/2020 - Fluor Corporation was awarded the front-end engineering and design (FEED) for Minnkota Power Cooperative’s (Minnkota) Project Tundra, a carbon capture...
Trinidad and Tobago >>  5/18/2020 - Aquaterra Energy, a leader in global offshore engineering solutions, has been awarded the FEED (Front End Engineering and Design) contract by DeNovo E...

Related Categories: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Related Articles: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 


United States Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 |

More News

Related Links

Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.