Source: www.gulfoilandgas.com 9/29/2016, Location: South America
In Norway Statoil has extended the contract for Skandi Mongstad with one year from October 2016. In Argentina Total Austral has extended the contract for Skandi Mogster with 6 months from October 2016. In Canada the contract for Skandi Flora has been extended with one well with estimated duration of 6 months. Planned startup is September/October 2016.
Assumed average Ebitda/day from the above contracts is approx. NOK 40-45 000/vessel
Skandi Mongstad and Skandi Flora are large PSVs built in 2008 and 2009 respectively and Skandi Mogster is an AHTS with 16 000 BHP built in 1998.
Brazil >> 12/23/2024 - BRAVA ENERGIA S.A. (“BRAVA” or "Company"), pursuant to CVM Resolution No. 44, in continuation of the Material Fact disclosed on July 1, 2024 regarding...
Brazil >> 12/23/2024 - SBM Offshore announced that the FPSO Alexandre de Gusmão has left the COSCO Shipping (Qidong) Offshore shipyard in China for Brazil. The vessel will b...
Guyana >> 12/19/2024 - SBM Offshore and ExxonMobil Guyana Ltd, an affiliate of Exxon Mobil Corporation, have completed the transaction related to the purchase of FPSO Liza D...
Nigeria >> 12/18/2024 - ABS has awarded Hanwha Ocean Approval in Principle (AIP) for its Pre-FEED Standard FPSO Design intended to create an asset optimized for deployment in...
Brazil >> 12/16/2024 - The Alexandre de Gusmão platform vessel left China, bound for the Mero oil field in the Santos Basin pre-salt layer. The platform, chartered by Petrob...