Development of The Third Phase of The Arab Gas Pipeline

Source: www.oilegypt.com 5/9/2004, Location: Africa

Cairo, May 9, 2004 Egypt Minister of Petroleum Sameh Fahmy declared that Syria has agreed on starting the procedures of establishing the third phase of the Arab Gas Pipeline. The 36 inch diameter pipeline will be extended from the Jordanian-Syrian border to Hems in central Syria and will be executed by FAGR Company.

Lebanon will be supplied by gas through a secondary pipeline extended from Hems in Syria to the Syrian Lebanese border in North Lebanon.

The pipeline segment from Hems to the Syrian-Turkish border will be executed either by the Syrian side or by the Arab corporation for gas.

The petroleum ministers of Egypt, Syria, Lebanon and Jordan agreed to assign Enppi to prepare the economic and technical studies for the third phase of the Arab Gas Pipeline.

On the other hand the Egyptian Minister of Petroleum Sameh Fahmy will visit Romania by the end of May to discuss the participation of Romania in establishing the export gas pipeline to Europe. Fahmy will also discuss the cooperation between Egypt and Romania in developing petrochemicals and fertilizers projects.



Nigeria >>  4/29/2022 - Subsea 7 announced the award of a substantial(1) contract for the engineering, procurement, installation, and commissioning of flowlines and umbilical...
Nigeria >>  4/26/2022 - Worley have been awarded a contract to provide main front-end engineering design (FEED Phase II) services for the Nigeria-Morocco Gas Pipeline (NMGP) ...

Related Categories: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Articles: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 


Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.