Gulf Oil and Gas accountACCOUNT

Maersk Oil finished Drilling (BD-04A) well at Al-Shaheen field, Qatar

Source: www.gulfoilandgas.com 5/23/2008, Location: Middle East

Maersk Oil Qatar has finished drilling the longest well (BD-04A) in the world with a length of 40,320 feet (12.3 km), beating the 20 year old record of the Russian Kola Peninsula exploratory well. With a horizontal section of 35,770 feet (10.9 km) Maersk Oil's well also extended the company’s previously held world record for the longest horizontal well by 9,000 feet (2.7 km). The entire horizontal section of the well is placed within a reservoir target which is only 20 feet (6 m) thick.

Drilling News in Qatar >>

Norway >>  12/12/2018 - Equinor Energy AS, operator of production licence 751, is in the process of completing the drilling of wildcat well 6407/11-1. The well was drilled ab...
Norway >>  12/12/2018 - The Norwegian Petroleum Directorate has granted Wellesley Petroleum AS a drilling permit for well 35/4-2, cf. Section 15 of the Resource Management Re...

Norway >>  12/10/2018 - The Norwegian Petroleum Directorate has granted Equinor a drilling permit for well 36/1-3 in production license PL 885. Well 36/1-3 will be drilled fr...
Argentina >>  12/7/2018 - President Energy, the upstream oil and gas company with a diverse portfolio of production and exploration assets focused primarily in Argentina, has p...

Morocco >>  12/7/2018 - Sound Energy, the Moroccan focused upstream gas company, has confirmed that the drilling at TE-10, the second well of a planned three exploration well...
Thailand >>  12/7/2018 - Ophir has provided an update on recent drilling activity in Indonesia and Thailand: Paus Biru Gas Discovery, Sampang PSC, Indonesia ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Qatar Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 |

Oil & Gas Projects in Qatar >>

More News

Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.