Subsea 7 Utilise C-Worker 7 Autonomous Surface Vessel in Egypt

Source: www.export-egypt.com 1/19/2018, Location: Africa

ASV Global is delighted to announce the successful deployment of one of its C-Worker 7 class of autonomous surface vessels for Subsea 7. The 7m autonomous surface vessel was used to support a pipelay operation off the coast of Egypt.

Fitted with a survey suite comprising a multibeam echosounder and side scan sonar, the C-Worker 7 carried out touchdown monitoring in support of the Seven Antares pipelay vessel.

A spokesperson from Subsea 7 said “The C-Worker 7 has proven to be a very capable vessel providing an excellent stable survey platform controlled by the Pipelay Vessel”.

Richard Daltry, Technical Director at ASV Global said “We are delighted to be supporting Subsea 7 in their quest to increase operational efficiency through the use of autonomous surface vessel technology. This operation marks a huge step in realising the potential of this technology and goes a long way to prove its operational readiness, particularly in a demanding offshore environment”.

The C-Worker 7 operated for a total of 37 days. Use of the autonomous C-Worker 7 replaced the need for an additional survey vessel resulting in significant cost savings. The C-Worker 7 also provided greater operational flexibility due to its superior endurance and improved availability compared to an equivalent manned vessel.

In addition, use of the C-Worker 7 resolved the technical challenge of surveying in very shallow waters whilst also removing the risk to personnel working at sea in small craft.

A custom payload frame was designed to house the specified survey suite. The modular frame slotted into the C-Worker 7’s moonpool to mount and deploy the sensors. Extensive testing confirmed that repeated sensor deployment was achieved within millimetre accuracy ensuring that no further survey sensor calibrations were required. Vessel trials and testing took place in the Solent, UK before the vessel was mobilised from ASV’s UK headquarters.

Throughout the operation the C-Worker 7 was controlled and monitored using the ASView control system from a control station set up onboard the Seven Antares. Subsea 7 Survey personnel piloted the C-Worker 7 and operated the survey sensors to ensure data accuracy and quality.

For more information about related Opportunities and Key Players visit Egypt Oil and Gas Projects


Australia >>  9/11/2024 - Aberdeen based cutting specialists CUT announced the successful completion of all required cuts for a key client as part of a large decommissioning pr...
United Kingdom >>  9/5/2024 - We are pleased to announce the delivery of the Navig8 Excellence this week, the third of six newbuild MR vessels from New Times Shipbuilding Co. due f...

Japan >>  9/4/2024 - Mitsui O.S.K. Lines, Ltd. (MOL; President & CEO: Takeshi Hashimoto) today announced that on September 4, the naming and launching ceremony was held fo...
Norway >>  9/4/2024 - Kongsberg Discovery is excited to announce another successful milestone reached in the development of HUGIN Endurance following a record setting multi...

Sweden >>  9/4/2024 - The innovative e-bunker vessel concept by SeaFjord Energy offers a new way of supplying energy to ships at sea and in ports
ABB’s advanced electr...

United Kingdom >>  9/4/2024 - ‘Soft start’ to Lowestoft Eastern Energy Facility (LEEF) operations underway with Norside Supporter vessel call.

The Port of Lowestoft, the...


Related Categories: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 

Related Articles: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.