Successful Drilling & Completion of Second Production Well at Dussafu

Source: www.gulfoilandgas.com 6/26/2018, Location: Africa

Panoro Energy is pleased to announce the successful drilling and completion of the second development well, DTM-3H, located in the Tortue field, within the Dussafu PSC, offshore Gabon.

The drilling of DTM-3H oil production well commenced in May 2018 and has now been successfully completed with no safety-related incidents, on schedule and within budget. Interpretation of the logging results indicates that the well was entirely consistent with pre-drill prognosis and objectives. DTM-3H was drilled and completed as a horizontal production well in the Gamba reservoir and encountered a long horizontal section of oil saturated Gamba sandstone as prognosed. The well has been suspended pending arrival and hook up to the FPSO in the third quarter 2018.

The rig will now move to drill the Ruche North East well, DRNEM-1, which is targeting an undrilled 4-way structure in the Gamba reservoir with Dentale potential. The DRNEM-1 well will be located approximately 3.5 km north east of the Ruche field in water depths of 117m. DRNEM-1 is expected to take approximately 40 days to drill. The objective of the well is to prove up additional resources in the greater Ruche area, to be aggregated with the existing Ruche field (which was discovered by Panoro in 2011) to form the basis of future development phases.

John Hamilton, Chief Executive Officer Panoro Energy said: “We are very pleased with the result of this second production well, which has come in on prognosis and is a key de-risking milestone in the Phase 1 development at Dussafu. We now look forward to start drilling the Ruche North East well in order to continue unlocking the considerable exploration potential at Dussafu”.

For more information about related Opportunities and Key Players visit West Africa Projects


Australia >>  12/5/2024 - - Drilling commenced on 5 December at the West Mereenie 29 (WM29) development well
- WM29 is the first of a two well deve...

Colombia >>  12/2/2024 - Canacol Energy Ltd. (“Canacol” or the “Corporation”) is pleased to provide the following update concerning its ongoing exploration and development dri...

Equatorial Guinea >>  11/29/2024 - Panoro Energy ASA (“Panoro” or the “Company”) can confirm that drilling of the S-6 (“Akeng Deep”) exploration well at Block S offshore Equatorial Guin...
United States >>  11/29/2024 - TomCo the US operating oil development group focused on using innovative technology to unlock unconventional hydrocarbon resources, announces that its...

Canada >>  11/27/2024 - Helium Evolution Incorporated ("HEVI" or the "Company"), a Canadian-based helium exploration company focused on developing assets in southern Saskatch...
Canada >>  11/27/2024 - First Helium Inc. (“First Helium” or the “Company”) announced plans to drill two complementary vertical Leduc oil targets at its Worsley property. The...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.