Gulf Oil and Gas accountACCOUNT

First Heat Exchanger Delivered to Amur GPP

Source: www.gulfoilandgas.com 9/28/2018, Location: Asia

The first spiral heat exchanger was delivered from St. Petersburg to the construction site of the Amur Gas Processing Plant (GPP). The domestically-produced unit is a key link in the Amur GPP’s helium production chain. The equipment was developed for the purpose of preheating and cooling nitrogen-helium mixture so as to purify helium.

The oil and gas sector’s most advanced and hi-tech spiral heat exchanger was produced in Russia for the first time as part of localization efforts as a result of cooperation between Gazprom, Germany’s Linde, and Power Machines.

Thanks to its unique design, the spiral heat exchanger can withstand temperature fluctuations of up to 400 degrees Celsius, almost twice as much as conventional heat exchangers. In addition, it demonstrates enhanced efficiency of heat exchange (at over 1,600 square meters, the heat exchange area is as large as a fifth of a football field) with relatively low metal consumption and small size (15.9 meters in length and 1.8 meters in diameter).

The heat exchanger, which weighs about 49 tons, was delivered by rail and car. The base for the unit is already in place. Another two heat exchangers will be supplied to the Amur GPP in 2019 and 2021.

Heat exchangers >>

Heat exchangers News in Russia >>

Indonesia >>  10/29/2019 - PT Pertamina Rosneft Pengolahan dan Petrokimia, joint venture of PJSC Rosneft Oil Company and Indonesian state oil and gas company Pertamina, signed a...
China >>  10/21/2019 - Total has signed a shareholders’ agreement with Chinese state-owned Zhejiang Energy Group (ZEG), to create a joint venture company dedicated to the su...

India >>  10/17/2019 - The Abu Dhabi National Oil Company (“ADNOC”), Adani Group (“Adani”), BASF SE (“BASF”) and Borealis AG (“Borealis”) have signed a Memorandum of Underst...
Russia >>  10/17/2019 - Rosneft has set drilling data monitoring stations with artificial intelligence elements at heavy drilling rigs. It was reported by the First Vice-Pres...

Related Categories: Adsorption Equipment & Materials  Aerators  Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Clarifiers  Condensers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Mixers, Static  Nozzles/Diffusers  Steam Generators  Ventilators 

Related Articles: Adsorption Equipment & Materials  Aerators  Air Conditioning & Refrigeration  Boilers  Cooling Towers  Emulsifiers  Furnaces  General  Heat exchangers  Mixers, Static  Steam Generators 


Russia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 |

Oil & Gas Projects in Russia >>

More News

Related Links

Gulf Oil and Gas
Copyright © 2019 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.