Gulf Oil and Gas accountACCOUNT

Lukoil Commissions Fifth Well at Filanovsky Field Second Stage

Source: www.gulfoilandgas.com 10/12/2018, Location: Asia

LUKOIL commissioned the fifth well at the second development stage of the Vladimir Filanovsky field in the Caspian Sea. The length of the main wellbore of the new bilateral production well is 2,956 meters, while the lateral's is 1,735 meters. The well's initial flow rate exceeded 3,300 tonnes of oil per day. As a result of the drilling program at the second development stage, the field's oil production is sustained at its plateau level of 6 million tonnes per year starting the second quarter of 2018.

The field's cumulative oil production has exceeded 10 million tonnes.

The Company plans to start drilling the sixth production well shortly. In total the construction of six production and two injection wells is planned at the field's second development stage.

The Company also progresses with the third development stage of the field. The substructure of a wellhead platform was installed offshore at the field in August; the platform's topside is currently being assembled with over 70% completion rate. The topside installation at the sea and the wellhead platform commissioning are planned in 2019.

Drilling News in Russia >>

Australia >>  5/21/2020 - JV partner Norwest Energy reports that operator Energy Resources has received approval from the Department of Mines, Industry Regulation & Safety in r...
Australia >>  5/18/2020 - Warrego Energy Limited (WGO), provides the following update in relation to Contingent and Prospective Resources for the West Erregulla gas field follo...

Norway >>  5/18/2020 - Equinor Energy AS, operator of production licence 827 S, has concluded the drilling of wildcat well 35/10-6. ...
Thailand >>  5/14/2020 - Tap Oil Limited is pleased to provide updated information in relation to the Manora 2020 development drilling campaign now scheduled to commence on or...

Norway >>  5/13/2020 - Neptune Energy has conducted the world’s first dual drilling operation from an integrated subsea template structure at the Fenja field in the Norwegia...
Norway >>  5/12/2020 - The Norwegian Petroleum Directorate has granted Spirit Energy Norway AS a drilling permit for well 7321/8-2 S, cf. Section 15 of the Resource Manageme...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Russia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 |

Oil & Gas Projects in Russia >>

More News

Related Links

Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.