Gulf Oil and Gas accountACCOUNT

BP Selects Name for Mad Dog 2 Production Platform

Source: www.gulfoilandgas.com 11/27/2018, Location: South America

BP has announced that the new floating production unit for the Mad Dog 2 project in the deepwater Gulf of Mexico will be named Argos. The name, chosen by the project team and an employee survey, is a reference to Odysseus’ loyal dog from "The Odyssey," and a nod to the Mad Dog spar, an existing production facility operated by BP that is located about six nautical miles away from the Argos site.

The Mad Dog 2 project includes the Argos platform with the capacity to produce up to 140,000 gross barrels of crude oil per day through a subsea production system from up to 14 production wells and eight water injection wells.

“Selecting Argos as the name of our newest platform is an important milestone for the Mad Dog 2 project, which remains on track and on budget,” said Starlee Sykes, BP’s regional president for the Gulf of Mexico and Canada. “This project is key to delivering high-margin production from one of the largest fields in the Gulf of Mexico, and it will strengthen our position in the basin for years to come.”

The platform will be the first new BP-operated production facility in the Gulf of Mexico since 2008, when Thunder Horse came online. It will be BP’s fifth operated platform in the Gulf of Mexico and it will help extend the life of the super-giant Mad Dog oil field beyond 2050.

Originally estimated to cost over $20 billion, BP worked with co-owners and contractors to simplify and standardize the platform’s design, reducing the overall project cost by about 60 percent. The final investment decision for the $9 billion project was approved in early 2017 by BP (60.5%) and co-owners BHP (23.9%) and Union Oil Company of California, an affiliate of Chevron U.S.A. Inc. (15.6%).

The hull and topsides of the Argos platform are currently under construction in South Korea, with oil production from the facility expected to begin in late 2021.

FPSO Vessels and Equipment News in Mexico >>

Ghana >>  2/21/2020 - YINSON Holdings Berhad has, via Yinson Production West Africa Limited, Yinson Gazania Production Ltd and Yinson Gazania Operations Limited, entered in...
Australia >>  2/17/2020 - GR Engineering Services Limited has announced that its wholly owned subsidiary, Upstream Production Solutions (Upstream PS) has entered into an agreem...

Israel >>  2/6/2020 - Energean Oil and Gas plc (ENOG) issues an update on the potential impacts of the Novel Coronavirus on the construction of the Energean Power FPSO Hul...
Brazil >>  2/5/2020 - MODEC has awarded Aibel a Letter of Intent (LOI) in connection with MODEC’s supply of a new-built FPSO to Equinor for the Bacalhau field in Brazil. ...

Brazil >>  1/30/2020 - MODEC, Inc. is pleased to announce that it has signed a Sales and Purchase Agreement (SPA) with Equinor Brasil Energia Ltda, a subsidiary of Equinor A...
Brazil >>  1/30/2020 - MODEC, Inc. (MODEC), Mitsui & Co., Ltd. (Mitsui), Mitsui O.S.K. Lines, Ltd. (MOL) and Marubeni Corporation (“Marubeni) have agreed that Mitsui, MOL an...

Related Categories: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 

Related Articles: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 


Mexico Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 |

More News

Related Links

Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.