Gulf Oil and Gas accountACCOUNT

Apache Achieves First Oil at Garten Development in UK

Source: www.gulfoilandgas.com 12/4/2018, Location: Europe

Apache Corporation (APA) announced it has initiated production from its Garten development on Block 9/18a Area-W in the United Kingdom sector of the North Sea. The discovery well, which is located 6 kilometers south of the Beryl Alpha Platform, was placed on production in late November, less than eight months after being drilled in March 2018.

The discovery well at Garten encountered a downthrown structural closure with 778 feet of net oil pay in stacked, high-quality, Jurassic-aged sandstone reservoirs. The well is currently producing from the Beryl sand at a rate of 13.7 thousand barrels of oil per day (MBOPD) and 15.7 million cubic feet of gas per day (MMCFPD). Two lower zones were also successfully tested, and all three zones will ultimately be commingled to maximize recovery. The strong initial rate establishes excellent momentum late in the year and will positively impact Apache’s 2019 production guidance. As previously disclosed, the recoverable resource is expected to exceed 10 million barrels of light oil plus associated natural gas. Apache has a 100 percent working interest in the Garten development.

Jon Graham, region vice president – North Sea for Apache, said, “We are proud to have brought the Garten field online well ahead of our original target of first-quarter 2019. Performance from the three zones we tested is very encouraging, and we expect this field will significantly increase Apache’s reserves and production in the UK. With exposure to strong Brent oil and UK natural gas prices, Garten will be a notable contributor to Apache’s cashflow in 2019.

“The Garten project is an excellent example of Apache’s strategy in the North Sea to focus exploration activity near operated facilities and leverage existing infrastructure. The pace of this project would not have been possible without the skills and expertise we have within our team and close collaboration with companies in our supply chain,” continued Graham. “The support we received from the Oil and Gas Authority cannot be overstated, and we are proud to be contributing toward maximizing economic recovery in the UK North Sea with the successful development of the field.”

“Garten is a unique technical achievement and represents Apache’s most complex smart well completion to date. Our delivery on this project underscores Apache’s strong mix of integrated technical capabilities, project management expertise and cost discipline,” added Mark Hobbs, director of Operations & Projects at Apache North Sea.

Dr. Andy Samuel, chief executive of the Oil and Gas Authority said, "It is great to see the Garten field come onstream less than a year from the original discovery and well ahead of the original plan. The Garten well was the 2,500th exploration well on the UK Continental Shelf. Apache’s continued success reinforces the tremendous potential of the UKCS, which Apache is unlocking using advanced data gathering and analytics with excellent application of a number of technologies including 3D seismic to uncover high value near-field prospectivity.”

The Garten field is tied back to the Beryl Alpha platform, which is located 180 miles northeast of Aberdeen. It follows Apache’s successful Callater field discovery in the Beryl area, which came online in May 2017.

Production News in United Kingdom >>

Angola >>  12/10/2018 - Eni started production from the Vandumbu field in Block 15/06, approximately 350 km North West of Luanda and 130 km West of Soyo, through West Hub N’G...
Kuwait >>  12/10/2018 - Kuwait Petroleum Corp. aims to produce 85,000 barrels of heavy crude oil a day by 2020/21, and 110,000 barrels per day by 2030/31, according to the te...

United Kingdom >>  12/10/2018 - Tailwind Energy has announced first oil from the 100% owned Gannet E redevelopment to the Triton FPSO. The subsea tieback project was completed in Se...
Iran >>  12/6/2018 - Iran says it should be exempted from any oil production cut deal as long as it remains under “illegal” US sanctions. The announcement was made by Iran...

Norway >>  12/5/2018 - The Vigdis field has been producing oil through the Snorre field for more than 20 years. Field production will now be boosted by almost 11 million bar...
Russia >>  12/5/2018 - Today, an official ceremony was held at the Bovanenkovskoye field to celebrate the commissioning of the field’s third and final gas production facilit...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Transportation, 4X4 Trucks  Utility Systems  Water Supply Services  Welding Products/Services 


United Kingdom Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 |

More News

Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.