Additional Production Capacity Added at Faregh Oil Field

Source: www.gulfoilandgas.com 1/8/2019, Location: Africa

Waha Oil Company (WOC), a National Oil Corporation subsidiary, has completed preparations on another horizontal well in the Faregh oil field ahead of the planned start of second-phase experimental gas production by the end of the first quarter of 2019.

Initial tests indicate that the B B-14-59 well is expected to produce up to 24 million cubic feet of gas, and 1500 barrels of condensate per day (bcpd), using a 64/64-inch wellhead choke.

This well is in addition to the expected 33 million cubic feet of gas, and 1400 bpcd production capacity of well B B-10-59, completed in November 2018.

NOC chairman, Eng. Mustafa Sanalla thanked staff dedicated to this project and underlined the importance of a refocused Faregh field to provide gas for local community use, and the fostering of further regional economic development.

For more information about related Opportunities and Key Players visit North Africa Projects


Egypt >>  8/4/2022 - An update on the drilling of the Al Jahraa-14 development well (AJ-14) in the Abu Sennan licence, onshore Egypt, is being released by United Oil & Gas...
Nigeria >>  7/29/2022 - San Leon, the independent oil and gas production, development and exploration company focused on Nigeria, notes the announcement made by Decklar Resou...

Ivory Coast (Cote D'Ivoire) >>  7/28/2022 - Eni has successfully drilled the Baleine East 1X well, the first exploration well in block CI-802 and second discovery on the Baleine structure, offsh...
Algeria >>  7/25/2022 - Eni and SONATRACH announce a further discovery in Sif Fatima II concession, located in the Berkine North Basin in the Algerian desert. The Rhourde Oul...

Australia >>  7/20/2022 - • Strong performance observed from the W6 Cadda gas discovery which flowed at a maximum recorded rate of 35 mmscfd.
• Comingled testing of the Ca...

Cuba >>  7/18/2022 - Highlights
- Logging operations completed and 11-3/4” casing run to 1243 metres
- Drilled ahead to 1698 metres at which point the drill st...


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.