Gas Recovery Coefficient Increases in SP4 Platform

Source: www.gulfoilandgas.com 6/8/2019, Location: Asia

To increase gas recovery coefficient and make the production period more stable in SPD4, some operations including perforation, producing from reservoir layer of K1, and matrix acidizing were carried out in SPD5.

This operations were carried out by installing a drill rig on SPD5 in parallel with the production process (SIMOP), during which time, K1 layer perforation in 11 wells and matrix acidizing in 9 wells were completed within 108 days.

Public relations reported, As a result of these operations, the reservoir layer of K1 became operational and wellhead flowing pressure was increased by an average of 330 for each well at the production rate of 80 million cubic feet a day.

The operation began in late February and was successfully completed in mid-June by oil and gas engineering directorate of POGC.

It is worth mentioning that the capability of domestic contractors to supply other equipment and ancillary services was used in this operation.

Currently, the repair operation on the well No. 2 of SPD5 is under way in order to improve its production potential.


Norway >>  7/6/2022 - A number of fields on the Norwegian Continental Shelf now have revised production licences authorised by the Ministry of Petroleum and Energy (NCS). I...
Australia >>  7/4/2022 - Jadestone Energy plc, an independent oil and gas production company focused on the Asia-Pacific region, provides the following update on operations at...

United Kingdom >>  7/4/2022 - IOG plc, the Net Zero UK gas and infrastructure operator focused on high return projects, has released an updated Investor Presentation incorporating ...
Kuwait >>  6/30/2022 - Dr. Muhammad Abdul Latif Al-Fares, His Excellency the Deputy Prime Minister, Minister of Oil, and Minister of State for Council Affairs, led the State...

Kuwait >>  6/30/2022 - Today, Thursday, the members of the (OPEC +) coalition decided to increase output by 648,000 barrels per day in August. Following the 30th ministerial...
Norway >>  6/30/2022 - The authorities have granted consent to start production from the Nova field in the North Sea. Nova will be developed with two seabed templates, one f...

Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 


Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.