Gulf Oil and Gas accountACCOUNT

Extension Contract in Brazil

Source: www.gulfoilandgas.com 6/14/2019, Location: South America

Extension Contract in BrazilNorskan has been granted a 1-year extension for the Skandi Botagofo with Petrobras applicable from June 2019. Skandi Botafogo is an AHTS (UT 722 L) built in 2006.

FPSO Vessels and Equipment News in Brazil >>

Gabon >>  8/7/2020 - With reference to stock exchange release dated 2 July 2020. BW Offshore is very pleased that all of the offshore employees have been safely released. ...
Norway >>  8/5/2020 - Total DK has extended the contracts for the PSV vessels Havila Fano and Havila Heroy from end of existing contracts until 01.06.20. Total DK has 3 opt...

Brazil >>  8/4/2020 - OOS Tiradentes, the Semi-Submersible Accommodation Vessel managed by CIMC Raffles Asset Operation and Management Center, received the notice to resum...
Brazil >>  8/3/2020 - Operational The fleet utilisation rate in the second quarter of 2020 was 6.5 per cent (Q2 2019: 71.6 per cent).

Prosafe refers to t...


Gabon >>  7/21/2020 - BW Offshore has received a one-year contract extension for the lease and operation of the FPSO Petróleo Nautipa. The firm period has been extended to ...
Singapore >>  7/15/2020 - Keppel Offshore & Marine Ltd (Keppel O&M) has through its wholly-owned subsidiaries in Singapore and Brazil secured two contracts worth a combined val...

Related Categories: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 

Related Articles: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 


Brazil Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |

More News

Related Links

Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.