Gulf Oil and Gas accountACCOUNT

5% Recovery Rate at Iranís Largest Joint Oilfield

Source: www.gulfoilandgas.com 8/13/2019, Location: Asia

The Director of Consolidated Planning at the National Iranian Oil Company (NIOC) said according to the MDPs provided to the NIOC for developing South and North Azadegan oilfields, the initial recovery rate in the Sarvak layer of South Azadegan is 5.1% and 4.5% in North Azadegan which is while the layer accounts for nearly 90% of the fieldís in-place oil reserves.

Speaking to Shana, Karim Zobeidi said this recovery rate is almost half of the average of that in other fields operated by NIOC in Iran, adding that Azadegan oilfield is estimated to hold 45 billion barrels of crude oil in its reserves.

According to him, the primary and secondary recovery rates of the Sarvak layer in the Ahwaz district are 10 and 2.5 percent, respectively, which is about half of that in Aghajari and Gachsaran fields.

Zobeidi also added that due to the need for large investments, the development of Azadegan field has not been fully possible in recent years and limited development is underway in the field.

He said 24% is the average rate of recovery of crude oil in Iran while the figure is 35% in the world.

With each percent of growth in recovery rate, over 7 billion barrels of oil can be recovered, he said; an amount which is tantamount to a daily production of 4 mbd or roughly $350 billion of revenue generation.

Reservoir Engineering & Recovery Methods News in Iran >>

United States >>  7/29/2020 - Graves & Co. Consulting is a reservoir engineering and geological consulting firm. We are pleased to announce the signing of a Master Service Agreemen...
Namibia >>  7/28/2020 - Tower Resources plc, the AIM-listed oil and gas company with a focus on Africa, is pleased to provide an update on activity in respect of license PEL ...

Australia >>  7/24/2020 - Talon Petroleum Limited provides the following information in relation to Prospective Resource and Contingent Resource numbers relevant to Talonís rec...
United Kingdom >>  7/15/2020 - Tendeka, an independent global completions service company, has joined the OSIsoft EcoSphere, a collection of more than 300 industrial leaders that pr...

Australia >>  7/14/2020 - Senex Energy Ltd released its independently assessed1 estimates of reserves and contingent resources as at 30 June 2020, reporting a 21% increase in S...
Namibia >>  7/7/2020 - Reconnaissance Energy Africa Ltd. has completed a comprehensive subsurface evaluation delineating large scale, prospective conventional hydrocarbon be...

Related Categories: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 

Related Articles: Formation Evaluation  General  Geological, Geophysical  Geophysical Contractors  Mud Logging  Reservoir Engineering & Recovery Methods  Seismic survey  Well Completion, Logging, Workover 


Iran Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 |

Oil & Gas Projects in Iran >>

More News

Related Links

Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.