Gulf Oil and Gas accountACCOUNT

Andalas Energy and Power Provides Operations Update on the Betun Selo KSO

Source: www.gulfoilandgas.com 11/5/2019, Location: Asia

Andalas Energy and Power has announced an operations update on the Betun Selo KSO, in which it has a production interest further to the agreement announced on 21 June 2019. The Company is currently undertaking a 4-well workover programme on the project.

Workover of the BTN 03 well was completed at the end of October and the well has now been put into production; initial flow rates remain inconsistent and therefore the Company will provide an update once these are at stablisied rates

The other 3 wells are producing at an average gross production rate for October of:
BTN01 35.7 bopd
BTN04 37.4 bopd
BTN14 24.7 bopd
The field delivered at an average gross production rate for October of 99.3 bopd with a maximum from the 3 wells of 119.3 bopd

The focus for the coming month will be improving field uptime by undertaking a field equipment maintenance programme. A further announcement will be made once we have achieved stable production from BTN03 and the other 3-wells.

Andalas Energy, CEO, Simon Gorringe said: 'We are pleased with the progresss at Betun Selo especially now that we have the production contribution from BTN03 supporting production from the other 3-wells. We look forward to seeing results from the maintenance initative to improve uptime so that we exceed our target production rate of 150 bopd (gross).'

Drilling News in Indonesia >>

Indonesia >>  11/13/2019 - Coro Energy has provided an operational update in relation to the drilling campaign in the Duyung Production Sharing Contract ('PSC') in the West Natu...
Norway >>  11/11/2019 - Norway's Petroleum Safety Authority has given Wintershall Dea consent for the exploration drilling of two wells in the Norwegian Sea. The wells 6604/5...

Australia >>  11/6/2019 - Cooper Energy (COE) announces a 10 well appraisal program by the PEL 92 joint venture commenced with the spudding of Callawonga-22 at 18:30 hours 5 No...
Egypt >>  11/5/2019 - The exploration wells, Baltim Southwest-1 and Baltim Southwest-2, in the Nile Delta region have been placed on production with a rate of around 190 mi...

Indonesia >>  11/5/2019 - Andalas Energy and Power has announced an operations update on the Betun Selo KSO, in which it has a production interest further to the agreement anno...
Brazil >>  11/4/2019 - Seadrill Limited (“Seadrill”) has secured a two year contract with Petroleo Brasileiro S.A. (“Petrobras”) for the West Tellus in Brazil. Total contra...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Indonesia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |

More News

Related Links

Gulf Oil and Gas
Copyright © 2019 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.