Gulf Oil and Gas accountACCOUNT

Panoro Energy Completes Dussafu DTM-4H Production Well

Source: www.gulfoilandgas.com 12/10/2019, Location: Africa

Panoro Energy is pleased to announce the successful completion of the DTM-4H well, the first of the phase 2 Tortue development wells. The well was drilled with the Borr Norve jackup drilling rig in 116 m water depth as a horizontal production well in the Gamba reservoir. A long horizontal section of good quality oil saturated Gamba sands was drilled and completed and the subsea tree installed ready for hook up early next year. The rig has now moved to the DTM-5H well location, the second of the four phase 2 production wells, and the DTM-5H well was recently spud. First production from the phase 2 Tortue wells is planned for March 2020 with all four phase 2 wells expected to be online by June 2020.

For more information about related Opportunities and Key Players visit West Africa Projects

Drilling News in Gabon >>

Norway >>  8/3/2020 - The Norwegian Petroleum Directorate has granted ConocoPhillips Skandinavia AS a drilling permit for well 6507/4-1, cf. Section 15 of the Resource Mana...
Norway >>  7/31/2020 - Equinor Energy AS, operator of production licence 532, has concluded the drilling of wildcat well 7219/9-3. ...

Israel >>  7/30/2020 - Zion Oil & Gas, Inc. (ZN) announces formal approval from the Israel Ministry of Energy of its drilling plan for its next well in Israel. ...
Norway >>  7/30/2020 - Norway's Petroleum Safety Authority has given Equinor consent to use the Maersk Intrepid mobile drilling facility for production drilling, completion ...

Norway >>  7/29/2020 - The Norwegian Petroleum Directorate has granted Equinor a drilling permit for wildcat well 6407/1-8 S & A in production licence PL 263 D.

W...

Australia >>  7/28/2020 - HIGHLIGHTS
West Erregulla Field
Independent certification by RISC Advisory, based on a single well (WE-2), confirms West Erregulla 2C C...


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gabon Oil & Gas 1 >>  2 | 3 | 4 |

Oil & Gas Projects in Gabon >>

More News

Related Links

Gulf Oil and Gas
Copyright 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.