Zenith Energy Announces Operational Update in Azerbaijan

Source: www.gulfoilandgas.com 12/12/2019, Location: Asia

Zenith Energy Ltd., (Zenith), (ZEN), the international oil & gas production company, is pleased to provide an update regarding well C-37 operations.

The Company can confirm that, in order to optimise future production from well C-37, it will install a custom-built bridge plug to isolate the Upper Cretaceous formation and enhance the long-term productivity to be obtained from the Middle Eocene formation.

Zenith expects that, following the installation, and when the well is placed in full operation, stabilised oil production from well C-37 will be approximately 250-300 barrels of oil per day without stimulation.

As announced on October 9, 2019, the Company plans to perform a series of stimulation activities to progressively further increase productivity from the Middle Eocene formation.

The Company will provide further information on these developments in due course.

Deepening of Well C-30

The Company can confirm that civil works at well C-30 have now been fully completed.

Zenith is currently in discussions with its REDPSA partner, SOCAR, to obtain final approvals to commence drilling operations.

Drilling of Exploratory Well in 2020

Zenith can confirm that it has initiated geological and technical investigations, with the approval and in consultation with SOCAR, for the identification of the most prospective location to drill an exploratory well within the Exploration Area of the REDPSA contract area.

Andrea Cattaneo, Chief Executive Officer of Zenith, commented:

"The Company looks forward to achieving stabilised production from well C-37 following the completion of downhole operations.

We are extremely motivated to achieve further success in C-30 well deepening operations with the benefit of the important experiences gained during C-37 operations."




Norway >>  5/24/2022 - The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 6507/2-6, cf.
Cuba >>  5/23/2022 - Melbana Energy Limited is pleased to provide this update on its two well exploration drilling program in its Block 9 contract area, onshore Cuba (Melb...

Norway >>  5/23/2022 - The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 6507/3-15 and well 6507/3-16, cf. Section 13 of the Resourc...
Norway >>  5/23/2022 - The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 30/3-11 S, cf. Section 13 of the Resource Management ...

Canada >>  5/19/2022 - PetroTal Corp. is pleased to announce that Q1 2022 results will be released on May 26, 2022, along with an extended investor webcast. Additionally, th...
Egypt >>  5/18/2022 - SDX Energy Plc (SDX) is pleased to announce the spudding of the MSD-24 infill development well on the Meseda field. This well is the fourth in a fully...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.