Gulf Oil and Gas accountACCOUNT

Maintenance & Overhaul Work on the Mega-Train of Skikda LNG Complex

Source: www.gulfoilandgas.com 12/17/2019, Location: Africa

Sonatrach has launched maintenance and overhaul work on the mega-train of the Skikda LNG Complex.

These in-depth revisions, scheduled in accordance with the requirements of the regulations governing the petroleum industry , require a two (02) month shutdown for the preparation, securing of the installations and carrying out the various works.

SONATRACH reassures that during this downtime, all necessary measures have been taken to ensure the supply of butane and propane gas to the local market. For the external market, it will be taken care of by the LNG and LPG separation complexes of Arzew.

For more information about related Opportunities and Key Players visit Algeria Oil and Gas Projects

Gas Processing >>

Gas Processing News in Algeria >>

Egypt >>  7/28/2020 - Eni (as the Operator of the Block), bp and Total (as Contractor members) have successfully tested the well drilled on the prospect called Bashrush, in...
Nigeria >>  7/14/2020 - McDermott International Ltd. has been awarded a *large engineering and procurement contract from Azikel Petroleum Ltd. for the modular 12,000 BPD Hydr...

Related Categories: Deodorization system  Gas dehydration  Gas sweetening  Gas Treating  General  GTL Processing  LNG Processing  LPG Domestic use  LPG Odorless  Packing  Phase Separation  Scrubbers 

Related Articles: Gas dehydration  Gas sweetening  Gas Treating  General  GTL Processing  LNG Processing  LPG Domestic use  LPG Odorless  Packing  Phase Separation  Scrubbers 


Algeria Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |

Oil & Gas Projects in Algeria >>

More News

Related Links

Gulf Oil and Gas
Copyright 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.