Kochmesskoye No. 4 Oil Well Reaches Target Depth

Source: Reuters 8/24/2009, Location: Asia

PrimeGen Energy Corp. wishes to advise that the drilling operator at the previously announced Timan-Pechora Project has reported that the drilling of Kochmesskoye # 4 well has reached total target depth yesterday at 3:35pm.

Testing of any potentially productive oil bearing zones has commenced. PrimeGen will be advised as to the commercial viability of the well and productive oil flow rates upon the completion of testing, which is anticipated by early next week. The well is the fourth of a proposed development program targeting a minimum of 30 oil wells to be drilled.

As part of the accelerated drilling program, a fifth well is scheduled for immediate drilling shortly after the results of the third well are announced. The first well of the project was drilled and completed on June 17, 2009, and resulted in setting a new production record for the field of 1,200 barrels of oil per day. PrimeGen expects that an additional 3 wells will be drilled during the third quarter of 2009.


United Kingdom >>  5/13/2022 - UK Oil & Gas PLC has announced that the North Sea Transition Authority (formerly the Oil and Gas Authority) has granted a one-year extension to the ag...
Australia >>  5/12/2022 - Western Gas has provided an operational update on the drilling of the Sasanof-1 exploration well and will issue further updates upon the completion of...

Norway >>  5/12/2022 - Aker BP ASA, operator of production licence 685, has concluded the drilling of wildcat well 35/4-3.

The well was drilled about 20 kilometre...

Tunisia >>  5/12/2022 - Serinus Energy plc (“Serinus”) (SENX) is pleased to announce its interim results for the three months ended 31 March 2022. ...

Indonesia >>  5/11/2022 - Indonesia Energy Corporation (INDO) ("IEC"), an oil and gas exploration and production company focused on Indonesia, announced that it has discovered ...
Turkey >>  5/11/2022 - Trillion Energy International Inc. is pleased to provide an update on progress towards its multi-well SASB gas field drilling program scheduled to com...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.