Capstone Turbine Secures Consecutive 200-Kilowatt Orders

Source: www.gulfoilandgas.com 8/13/2020, Location: Europe

Capstone Turbine Corporation, the world's leading clean technology manufacturer of microturbine energy systems, announced that it received two consecutive orders that include a C200S for a wastewater treatment facility and a C200R for a recreational waterpark in Poland. ASPAMET, Capstone's exclusive distributor in Poland, secured the orders, which are expected to be commissioned in early 2021.

"During our recent earnings call, I outlined our six-part revenue growth strategy, which included an initiative to grow our global distributor business. I highlighted that we are specifically interested in growing our distributor businesses in untapped markets such as Eastern Europe, Northern Africa, parts of Asia, and the Middle East as these geographies represent a tremendous upside for us and are currently underserved," said Darren Jamison, Capstone's President and Chief Executive Officer. "ASPAMET has developed a nice pipeline of projects, and I'm excited to see these two great projects added to their growing list of successful sites helping to accelerate microturbine adoption in the region," added Mr. Jamison.

Destined for a municipal water and treatment facility in the city of Minsk Mazowiecki, the C200S microturbine will replace an aging reciprocating engine. Once commissioned, the microturbine will operate on the biogas, or "organic waste," produced on-site from municipal solid waste. The C200S microturbine will be deployed in a combined heat and power (CHP) configuration. The clean heat exhaust from the microturbines will be captured using heat exchangers and used for digester heating, hot water production, and the preheating of sludge to support the water treatment process, all while providing the highest system efficiency possible.

Wastewater treatment plants are considered to be some of the largest consumers of energy for cities and municipalities. Improving energy efficiency in wastewater treatment facilities can produce a range of environmental and economic benefits, including lowering carbon emissions, reducing energy costs, and improving energy and water security.

Plant operators selected Capstone Turbine's innovative microturbine solution as a trusted source of reliable technology. In Poland, Capstone Turbine is known for several successful biogas-fueled microturbine projects, including at a nearby waste treatment facility in Kraków. These regional site applications further confirmed to plant operators the high reliability and very high availability of Capstone's microturbine technology in the field.

The second order for a low-pressure natural gas-fueled C200R microturbine will be installed in a large recreational water park with amenities that include numerous swimming pools, an early education center, recreation facility, ice rink, and go-kart track. The C200R's ultra-low exhaust emissions and relatively low noise levels were of particular interest to park operators as some of the facility will be utilized for a kindergarten classroom for the local community.

The C200 microturbine will serve as the primary source of electrical power for the energy intensive site and will be installed in a CHP application designed to cover all basic energy and heating needs. Along with industry-leading reliability and resiliency, the C200R features low-emissions, low maintenance costs, and a low carbon footprint.

Both sites received incentive funding from the European Union with a grant that supports energy-related projects that will benefit the environment by reducing greenhouse gas emissions, increasing the use of renewable energy, or improving energy efficiency. The water park received additional funding from the Polish National Fund for Environmental Protection and Water Management.

"The investment will ensure energy independence in the reality of rapidly changing electricity prices. Environmental parameters of Capstone turbines perfectly fit into the character of both site installations," said Tomasz Bak, Electrical Engineer at ASPAMET.


Finland >>  1/13/2022 - At the end of 2021, the Nordex Group received its first order in Finland from Enefit Green AS, one of the leading diversified renewable energy produce...
United Kingdom >>  1/13/2022 - - Major milestone in one of the world’s largest offshore wind farms which will contribute towards the delivery of clean energy from offshore wind in t...

South Korea >>  1/10/2022 - DNV, the independent energy expert and assurance provider, has been selected by the Korean Energy Agency (KEA) to deliver Type Certification services ...
Finland >>  1/4/2022 - – Wind farm comprises 56 Delta4000 turbines of the latest turbine type N163/6.X of the 6 MW class
– Premium long-term service agreement

...


Brazil >>  12/31/2021 - Vestas has secured the order from Elera Renovaveis for the 248 MW Serido Oeste project, located in Parelhas, Rio Grande do Norte, Brazil. ...
France >>  12/31/2021 - Renewable energy producer H2air has placed an 80 MW order for three projects in France. The Ardennes I wind park, to be located in Grand-Est, will fea...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.