Boskalis Took on Two Exceptional Transport and Installation Projects

Source: www.gulfoilandgas.com 9/2/2020, Location: Europe

Royal Boskalis Westminster N.V. (Boskalis) recently took on two exceptional projects. The first project involves the transport and installation of five floating wind turbines for the Kincardine floating wind farm off the coast of Aberdeen in Scotland. The second project involves the installation of bridge sections of the world’s longest suspension bridge, the Çanakkale 1915 Bridge in Turkey. Decisive factors for the award of both contracts are Boskalis’ versatility in the field of offshore transport and installation work and the wide variety of specialized Boskalis equipment with which it is able to fully execute the projects.

Kincardine floating wind farm
For Cobra Wind International Ltd, Boskalis will transport and install five floating wind turbines for the Kincardine offshore wind farm fifteen kilometers off the coast of Aberdeen. This will be Boskalis’ first floating wind farm project. The turbines with a capacity of 9.525 megawatts each will be anchored at a depth of sixty to eighty meters. In September 2020, the heavy anchor handling tug (AHT) BOKA Falcon will start installing the anchors and chains on the seabed. In the meantime, the floating foundations will be transported from Ferrol in Spain to Rotterdam, for which Boskalis will deploy the Fjord as a semi-submersible barge. In Rotterdam, the wind turbines will be mounted on the foundations, after which the floating wind turbines are towed to the wind farm. In addition to the BOKA Falcon and Fjord, three Boskalis AHTs will be deployed on this project.

Çanakkale 1915 Bridge
Boskalis will install twenty bridge sections for the 4,600-meter-long Çanakkale 1915 bridge in Southwest Turkey. The floating sheerleg crane Asian Hercules III, one of the few sheerlegs in the world with sufficient outreach, will be deployed for lifting and installing the sections. A Boskalis AHT will provide assistance during the execution of these activities, which will take place in 2021.

In 2019 Boskalis was already involved in the construction of the bridge with the installation of the foundations of the bridge pylons and various other lifting and transport operations of steel and concrete bridge elements. The client is DSLY; a consortium of the South Korean Daelim and SK Group, and the Turkish partners Limak Holding and Yapi Merkezi.


Germany >>  12/4/2024 - The Hamburg-based wind and solar park operator Encavis AG has acquired a wind farm with a generation capacity of 28.5 megawatts (MW) in Everswinkel (N...
India >>  12/4/2024 - Suzlon and JSP Green Wind 1 Pvt. Ltd., a subsidiary of Jindal Renewables, have expanded their partnership with an additional 302.4 MW wind power proje...

United States >>  12/4/2024 - Pacolet Milliken, LLC ("Pacolet"), a sustainability-focused, family-owned investment firm, announced today it has acquired 100% of Anderson Wind Farm ...
United States >>  12/4/2024 - Pregis®, a global leader in protective packaging, mailing and bagging, and flexible packaging solutions, has taken a transformative step toward its 20...

France >>  12/3/2024 - eading renewable energy consultancy and service provider, Natural Power, has supported Alterric with the construction of the Clais Wind Farm extension...
Ireland >>  12/3/2024 - Commerz Real has secured a new wind farm in the Irish Midlands for its klimaVest fund. The acquisition of Moanvane wind farm in County Offaly marks th...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.