Northern Endeavour FPSO Contract

Source: www.gulfoilandgas.com 12/23/2020, Location: Not categorized

GR Engineering Services Limited is pleased to announce that its wholly owned subsidiary, Upstream Production Solutions Pty Ltd (Upstream PS) has been awarded a one year contract with the Department of Industry, Science, Energy and Resources of the Australian Government (DISER) to provide operations, maintenance and project services to the Northern Endeavour FPSO (FPSO) and associated infrastructure (the Contract) in preparation for a disconnection and removal of the FPSO.

As previously announced on 15 May 2020, Upstream PS has been engaged by the Commonwealth since mid-February 2020 to provide operations and maintenance services to the FPSO, in a non-producing state. The current contract is due to expire on 31 December 2020.

The term of the new Contract expires on 31 December 2021. Based on the current budget for core operation and maintenance services and planned pre-disconnection project activities, it is anticipated that revenue from the Contract will be approximately $130 million.

Commenting on the award of the Contract, GR Engineering’s Managing Director, Geoff Jones stated that:
“We are pleased to continue working with DISER and the relevant regulatory bodies to safely manage and maintain the FPSO and execute the required pre-disconnect preparation activities to support a safe removal of the FPSO in the future.”


Norway >>  11/14/2025 - BW Offshore and BW Group have established a 50/50 joint venture entity (JV), BW Elara, to design and build Floating Desalination Units (FDUs), produci...
Nigeria >>  11/6/2025 - The Commission Chief Executive of the Nigerian Upstream Petroleum Regulatory Commission (NUPRC), Engineer Gbenga Komolafe, has expressed delight over ...

Brazil >>  10/28/2025 - Petrobras announces that the FPSO Almirante Tamandaré, operating in the Búzios field, located in the pre-salt layer of the Santos Basin, reached a rec...
United States >>  10/28/2025 - With improved safety for offshore operations as the objective, ABS launched ABS EagleTwin™, a web-based structural digital twin solution tailored for ...

United Kingdom >>  10/21/2025 - Following the announcement on 8 October that an issue with the flare system on the Triton FPSO resulted in a temporary suspension of production, produ...
Brazil >>  10/16/2025 - Galp, partner in the consortium for the development of the Bacalhau field in BM-S-8 and North Carcará licenses, informs that FPSO Bacalhau has started...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.