Northern Endeavour FPSO Contract

Source: www.gulfoilandgas.com 12/23/2020, Location: Not categorized

GR Engineering Services Limited is pleased to announce that its wholly owned subsidiary, Upstream Production Solutions Pty Ltd (Upstream PS) has been awarded a one year contract with the Department of Industry, Science, Energy and Resources of the Australian Government (DISER) to provide operations, maintenance and project services to the Northern Endeavour FPSO (FPSO) and associated infrastructure (the Contract) in preparation for a disconnection and removal of the FPSO.

As previously announced on 15 May 2020, Upstream PS has been engaged by the Commonwealth since mid-February 2020 to provide operations and maintenance services to the FPSO, in a non-producing state. The current contract is due to expire on 31 December 2020.

The term of the new Contract expires on 31 December 2021. Based on the current budget for core operation and maintenance services and planned pre-disconnection project activities, it is anticipated that revenue from the Contract will be approximately $130 million.

Commenting on the award of the Contract, GR Engineering’s Managing Director, Geoff Jones stated that:
“We are pleased to continue working with DISER and the relevant regulatory bodies to safely manage and maintain the FPSO and execute the required pre-disconnect preparation activities to support a safe removal of the FPSO in the future.”


Vietnam >>  12/2/2024 - PTSC Asia Pacific (“PTSC AP”), a joint venture between Yinson Production (49%) and PetroVietnam Technical Services Corporation (“PTSC”; 51%), has ex...
Brazil >>  11/29/2024 - Petrobras informs that it has initiated a new procurement process for the construction of up to two FPSO oil production units for the Sergipe Deep Wat...

Nigeria >>  11/28/2024 - Eni’s subsidiary Nigerian Agip Exploration Limited (NAE) and STAC Marine celebrate one year of successful collaboration for the operation and maintena...
Guyana >>  11/21/2024 - SBM Offshore announces it has completed the project financing of FPSO Jaguar for a total of US$1.5 billion.

The project financing was f...


Brazil >>  11/17/2024 - Yinson Holdings Berhad (“Yinson”) proudly hosted Malaysia Prime Minister, The Honourable Anwar Ibrahim at a networking reception in Rio de Janeiro t...
South Korea >>  11/15/2024 - Hae-Ki Jang, CTO of Samsung Heavy Industries, and Sean van der Post, Lloyd’s Register’s Offshore Business Director at the signing ceremony. The MOU w...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.