Turn-Key Project Installed at Gazpromneft Refinery in Omsk

Source: www.gulfoilandgas.com 12/30/2020, Location: Asia

Turn-key delivery, installation and commissioning completed of continuous emissions monitoring system at Gazpromneft Refinery in Omsk (Russia). Within the framework of this project Modcon specialists were responsible for detailed engineering, system integration, software development, execution of installation works, commissioning, permitting documentation and handover to the Customer.


United Arab Emirates >>  1/14/2025 - Flowserve Corporation (NYSE: FLS) (“Flowserve” or the “Company”), a leading provider of flow control products and services for the global infrastructu...
United States >>  1/14/2025 - Gigablue, a provider of scalable, affordable carbon dioxide removal (CDR) technologies, announced today that it has signed an agreement with SkiesFift...

Australia >>  1/13/2025 - Snowy Hydro has released its 2024 Sustainability Report, covering the progress the energy generator and retailer has made in areas such as environment...
Belgium >>  1/13/2025 - Vioneo plans to produce plastics from green methanol at new European facility, to be powered by renewable energy
Honeywell’s advanced methanol-to...


France >>  1/13/2025 - GEODIS is pleased to announce that the SBTi has approved its near-term science-based emission reduction target.

The SBTi approval acknowled...

Lithuania >>  1/13/2025 - Capsol Technologies’ first of two CapsolGo® demonstrations campaigns for cement producer SCHWENK has commenced operations at Akmenes cement plant in L...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.