Kongsberg to Supply Equipment to World’s Largest Offshore Wind Farm

Source: www.gulfoilandgas.com 1/21/2021, Location: Europe

Kongsberg Maritime has announced that it will be supplying key positioning and monitoring equipment to Equinor’s Hywind Tampen floating wind farm, as part of a contract with industrial solutions provider Wood PLC.

The 88MW installation is the first of its type to be installed to supply renewable energy directly to offshore oil and gas platforms, and Kongsberg Maritime will supply technologies from its existing offshore product portfolio to meet the specific challenges posed by operating in this challenging and sometimes hostile environment. By using proven equipment which is already successfully in use in other areas of the offshore maritime market, KONGSBERG is able to ensure safe, tried-and-tested performance whilst at the same time reducing both cost and development time.

Kongsberg Maritime’s world-class portfolio of solutions for positioning in the offshore environment is built on many years of experience and application know-how, and core to this product delivery is its DPS position reference system and Motion Reference Unit (MRU). The DPS exploits all available GNSS infrastructure to deliver continuously available, reliable position information, and is ideally suited to monitor the location of the turbines relative to the seabed. This will help to ensure secure, safe and optimal positioning for each unit within the wind farm.

The MRU will check roll, pitch, yaw and heave motion, informing the blade trimming system to ensure that the turbine is not overloaded in strong winds and thus likely to become unstable. Marine traffic situational awareness and visibility to other vessels will be facilitated by the AIS AQ610 base station. All the KONGSBERG equipment permits remote access and monitoring.

Vidar Bjorkedal, Vice President Sales & Customer Support, Kongsberg Seatex AS, said: “We are delighted to be involved with this innovative project. Kongsberg Maritime’s offshore positioning portfolio leads the market, and it is a testament to the versatility of these existing technologies that they are being shown to be optimal for use in a range of diverse applications, including windfarms.”

ABOUT HYWIND TAMPEN
Hywind Tampen is an 88MW floating wind power project intended to provide electricity for the Snorre and Gullfaks offshore field operations in the Norwegian North Sea. It will be the world’s first floating wind farm to power offshore oil and gas platforms.

It will also be the world’s largest floating offshore wind farm and an essential step in industrialising solutions and reducing costs for future offshore wind power projects.


Norway >>  5/6/2021 - Equinor and Vargronn have signed a collaboration agreement to jointly apply for offshore wind acreage in Norway for the Utsira Nord area. ...
Poland >>  5/5/2021 - Axpo is expanding cooperation with one of its long-standing customers in Poland. The company’s Warsaw-headquartered subsidiary has signed two power pu...

Spain >>  5/5/2021 - Greenalia, a renewable energy company from A Coruña, will develop the Monte do Cordal wind farm in the municipality of Friol (Lugo). The wind farm wil...
Australia >>  5/4/2021 - Amp Power Australia Pty Limited, the Australian operating company of global developer Amp Energy ("Amp") has announced the establishment of the Renewa...

Poland >>  5/4/2021 - Poland’s Energy Regulatory Office (ERO) announced Equinor and Polenergia’s Baltyk II and Baltyk III projects were awarded contracts for difference (Cf...
Spain >>  5/4/2021 - X1 Wind is preparing to deploy its ground-breaking PivotBuoy® floating wind technology in the Canary Islands after successfully completing the assembl...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.