The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor focused on the company’s construction of substructures for Hywind Tampen.

Structural safety
The audit was conducted on 15 and 16 March 2021.

Background
Hywind Tampen is the first large offshore wind power development on the Norwegian Continental Shelf. It will generate electrical power for use on the Snorre and Gullfaks fields, and is scheduled to commence production in 2022.

Objective
The objective of the audit was to verify that fabrication of the substructures for Hywind Tampen is being carried out in compliance with the HSE regulations, so as to achieve a prudent HSE level.

Result
No regulatory non-conformities were identified during the audit.

Four improvement points were identified in connection with:
- Documentation of dimensioning collision energy
- DFU 5C has not been updated in accordance with current design assumptions
- Deficiencies in learning after incident entailing temporary halt in casting work
- Outstanding reporting of concrete quality

What happens now?
We have asked Equinor for their assessment of the improvement points observed. The reply deadline is set at 14 May 2021.


Norway >>  6/23/2021 - On June 18, Sleipnir successfully installed the 12,050 metric ton Johan Sverdrup processing platform (P2) jacket, setting a new record for the heavies...
United Kingdom >>  6/23/2021 - Petrofac will build on its 18-year tenure supporting the Kittiwake platform in the UKCS, following the award of a one-year contract extension from EnQ...

Norway >>  6/15/2021 - Wood has been awarded an extension to its existing framework agreement with international energy company, Equinor, to support their offshore assets in...
Scotland >>  6/15/2021 - Optimizing waste streams throughout the decommissioning process, the strategy promises to minimize required Intermediate Level Waste and associated co...

Norway >>  6/10/2021 - Neptune Energy announced the successful completion of a virtual reality pilot on its operated Gjoa platform in the Norwegian North Sea, enabling teams...
United Kingdom >>  6/10/2021 - Solstad Offshore ASA is pleased to announce that the company has signed long -term contracts with Harbour Energy for two large PSVs. Normand Service ...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.