Prosafe Announces Safe Boreas Contract Extension

Source: www.gulfoilandgas.com 7/9/2021, Location: Europe

CNOOC Petroleum Europe Limited has exercised two of the three 30-day options available to them, to extend the Safe Boreas at the Buzzard platform complex in the UK sector of the North Sea until end-September 2021.


Norway >>  5/9/2022 - The Petroleum Safety Authority Norway (PSA) has given Equinor Energy AS (Equinor) consent to use a water injection facility at Gudrun.

Oper...

United States >>  5/5/2022 - Petrofac, a leading provider of services to the global energy industry, and Promethean Decommissioning Company (PDC), a pure-play Decommissioning Oper...

United States >>  5/2/2022 - A pioneering joint development project (JDP) to advance carbon-reduction technologies between ABS and Hyundai Heavy Industries Group (HHI Group) has t...
United Kingdom >>  4/22/2022 - - First job for Pioneering Spiritís Jacket lift system
- Single-lift removal and transport of 8100-tonne Ninian Northern jacket
- Revolutio...





Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.