Second Nord Stream 2 String Filled with Technical Gas

Source: www.gulfoilandgas.com 12/29/2021, Location: Asia

The gas-in procedure for the second string of the Nord Stream 2 Pipeline has been completed. As planned and in line with the system design requirements, the string is filled with some 177 million m3 of so-called technical gas, reaching a pressure of 103 bar in the pipeline. This pressure is sufficient to start gas transportation in the future.


Canada >>  6/28/2022 - CruxOCM, the pioneer of robotic industrial process automation (RIPA™), announced that Phillips 66 has committed to further expanding its production im...
Australia >>  6/27/2022 - Highlights
• Tamboran and Jemena have signed a binding Memorandum of Understanding (MOU) to enable Tamboran to contract ~100 TJ per day of firm ...


Nigeria >>  6/27/2022 - The Ministry of Petroleum of the Republic of Niger is proud to announce that the country has reached a new milestone in the further opening of the nat...
Australia >>  6/20/2022 - Leading Australian energy infrastructure business, APA Group announced the execution of a 30-year Gas Transportation and Storage Agreement and a Devel...

United States >>  6/15/2022 - Sustainable aviation fuel (SAF) has been safely delivered to New York’s LaGuardia Airport through the Colonial and Buckeye pipeline systems – two esse...
United States >>  6/15/2022 - Sustainable aviation fuel (SAF) has been safely delivered to New York’s LaGuardia Airport through the Colonial and Buckeye pipeline systems – two esse...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.